Notice: Trying to get property 'roles' of non-object in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 50

Warning: in_array() expects parameter 2 to be array, null given in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 50

Notice: Trying to get property 'roles' of non-object in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 54

Warning: in_array() expects parameter 2 to be array, null given in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 54

Notice: Trying to get property 'roles' of non-object in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 55

Warning: in_array() expects parameter 2 to be array, null given in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 55

Notice: Trying to get property 'roles' of non-object in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 56

Warning: in_array() expects parameter 2 to be array, null given in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 56

Notice: Trying to get property 'roles' of non-object in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 57

Warning: in_array() expects parameter 2 to be array, null given in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 57

Notice: Trying to get property 'roles' of non-object in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 58

Warning: in_array() expects parameter 2 to be array, null given in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 58

Notice: Trying to get property 'roles' of non-object in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 59

Warning: in_array() expects parameter 2 to be array, null given in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 59

Notice: Trying to get property 'roles' of non-object in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 60

Warning: in_array() expects parameter 2 to be array, null given in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 60

Notice: Trying to get property 'roles' of non-object in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 66

Warning: in_array() expects parameter 2 to be array, null given in /var/www/html/sipemikir/wp-content/plugins/wp-sipd/public/partials/monev/wpsipd-public-monitor-rfk.php on line 66

Realisasi Fisik dan Keuangan (RFK)
5.01.5.05.0.00.02.0000 BADAN PERENCANAAN PEMBANGUNAN, PENELITIAN DAN PENGEMBANGAN DAERAH
Bulan Desember Tahun 2024

Unit Organisasi : 5.01.5.05.0.00.02.0000 BADAN PERENCANAAN PEMBANGUNAN, PENELITIAN DAN PENGEMBANGAN DAERAH
Sub Unit Organisasi : 5.01.5.05.0.00.02.0000 BADAN PERENCANAAN PEMBANGUNAN, PENELITIAN DAN PENGEMBANGAN DAERAH
Kode Urusan/ Bidang Urusan Pemerintahan Daerah Dan Program/ Kegiatan RKA SIPD (Rp.) DPA SIMDA (Rp.) Realisasi Keuangan (Rp.) Capaian ( % ) RAK ( % ) Deviasi ( % ) Realisasi Fisik ( % ) Nilai Realisasi Fisik ( Rp ) Sumber Dana Keterangan / Permasalahan Catatan Verifikator
1 2 3 4 5 6 7 8 9 10 = (9 / 8) * 100 11 12 = ((11-10)/11) * 100 13 = (14 / 8) * 100 14 = (8 * 13) / 100 15 16 17
5         UNSUR PENUNJANG URUSAN PEMERINTAHAN
5 01       PERENCANAAN 9.507.174.668 0 9.298.150.354 0 0 0
5 01 01     PROGRAM PENUNJANG URUSAN PEMERINTAHAN DAERAH KABUPATEN/KOTA 5.382.674.668 0 5.264.641.763 0 0 0
5 01 01 2.01   Perencanaan, Penganggaran, dan Evaluasi Kinerja Perangkat Daerah 56.760.000 0 56.461.200 0 0 0
5 01 01 2.01 0001 Penyusunan Dokumen Perencanaan Perangkat Daerah 26782000.00==26782000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 26.782.000 0 26.628.200 0 0 0
5 01 01 2.01 0007 Evaluasi Kinerja Perangkat Daerah 29978000.00==29978000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 29.978.000 0 29.833.000 0 0 0
5 01 01 2.02   Administrasi Keuangan Perangkat Daerah 3.845.790.168 0 3.783.228.575 0 0 0
5 01 01 2.02 0001 Penyediaan Gaji dan Tunjangan ASN 3828331168.00==3828331168.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 3.828.331.168 0 3.765.782.775 0 0 0
5 01 01 2.02 0007 Koordinasi dan Penyusunan Laporan Keuangan Bulanan/ Triwulanan/ Semesteran SKPD 17459000.00==17459000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 17.459.000 0 17.445.800 0 0 0
5 01 01 2.05   Administrasi Kepegawaian Perangkat Daerah 245.000.000 0 234.451.965 0 0 0
5 01 01 2.05 0003 Pendataan dan Pengolahan Administrasi Kepegawaian 10000000.00==10000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 10.000.000 0 9.959.600 0 0 0
5 01 01 2.05 0009 Pendidikan dan Pelatihan Pegawai Berdasarkan Tugas dan Fungsi 15000000.00==15000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 15.000.000 0 13.823.419 0 0 0
5 01 01 2.05 0011 Bimbingan Teknis Implementasi Peraturan Perundang-Undangan 220000000.00==220000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 220.000.000 0 210.668.946 0 0 0
5 01 01 2.06   Administrasi Umum Perangkat Daerah 721.145.000 0 710.431.411 0 0 0
5 01 01 2.06 0001 Penyediaan Komponen Instalasi Listrik/Penerangan Bangunan Kantor 5000000.00==5000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 5.000.000 0 4.996.550 0 0 0
5 01 01 2.06 0002 Penyediaan Peralatan dan Perlengkapan Kantor 208025000.00==208025000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 208.025.000 0 200.629.700 0 0 0
5 01 01 2.06 0003 Penyediaan Peralatan Rumah Tangga 17500000.00==17500000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 17.500.000 0 17.441.800 0 0 0
5 01 01 2.06 0004 Penyediaan Bahan Logistik Kantor 60000000.00==60000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 60.000.000 0 57.859.550 0 0 0
5 01 01 2.06 0005 Penyediaan Barang Cetakan dan Penggandaan 13000000.00==13000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 13.000.000 0 12.686.650 0 0 0
5 01 01 2.06 0006 Penyediaan Bahan Bacaan dan Peraturan Perundang-undangan 4620000.00==4620000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 4.620.000 0 4.620.000 0 0 0
5 01 01 2.06 0009 Penyelenggaraan Rapat Koordinasi dan Konsultasi SKPD 413000000.00==413000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 413.000.000 0 412.197.161 0 0 0
5 01 01 2.08   Penyediaan Jasa Penunjang Urusan Pemerintahan Daerah 180.170.632 0 167.433.520 0 0 0
5 01 01 2.08 0002 Penyediaan Jasa Komunikasi, Sumber Daya Air dan Listrik 70000000.00==70000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 70.000.000 0 58.950.222 0 0 0
5 01 01 2.08 0003 Penyediaan Jasa Peralatan dan Perlengkapan Kantor 25786000.00==25786000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 25.786.000 0 25.013.760 0 0 0
5 01 01 2.08 0004 Penyediaan Jasa Pelayanan Umum Kantor 84384632.00==84384632.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 84.384.632 0 83.469.538 0 0 0
5 01 01 2.09   Pemeliharaan Barang Milik Daerah Penunjang Urusan Pemerintahan Daerah 333.808.868 0 312.635.092 0 0 0
5 01 01 2.09 0001 Penyediaan Jasa Pemeliharaan, Biaya Pemeliharaan, dan Pajak Kendaraan Perorangan Dinas atau Kendaraan Dinas Jabatan 124367268.00==124367268.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 124.367.268 0 108.305.310 0 0 0
5 01 01 2.09 0009 Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya 209441600.00==209441600.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 209.441.600 0 204.329.782 0 0 0
5 01 02     PROGRAM PERENCANAAN, PENGENDALIAN DAN EVALUASI PEMBANGUNAN DAERAH 1.399.500.000 0 1.367.206.311 0 0 0
5 01 02 2.01   Penyusunan Perencanaan dan Pendanaan 1.127.500.000 0 1.105.053.611 0 0 0
5 01 02 2.01 0001 Analisis Kondisi Daerah, Permasalahan, dan Isu Strategis Pembangunan Daerah 280000000.00==280000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 280.000.000 0 278.134.550 0 0 0
5 01 02 2.01 0003 Pelaksanaan Konsultasi Publik 33500000.00==33500000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 33.500.000 0 29.897.800 0 0 0
5 01 02 2.01 0004 Koordinasi Pelaksanaan Forum Perangkat Daerah/Lintas Perangkat Daerah 69450000.00==69450000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 69.450.000 0 56.618.900 0 0 0
5 01 02 2.01 0005 Pelaksanaan Musrenbang Kabupaten/Kota 222155500.00==222155500.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 222.155.500 0 221.831.011 0 0 0
5 01 02 2.01 0006 Penyiapan Bahan Koordinasi Musrenbang Kecamatan 70000000.00==70000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 70.000.000 0 69.400.600 0 0 0
5 01 02 2.01 0007 Koordinasi Penyusunan dan Penetapan Dokumen Perencanaan Pembangunan Daerah Kabupaten/Kota 452394500.00==452394500.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 452.394.500 0 449.170.750 0 0 0
5 01 02 2.02   Analisis Data dan Informasi Pemerintahan Daerah Bidang Perencanaan Pembangunan Daerah 100.000.000 0 91.739.900 0 0 0
5 01 02 2.02 0001 Analisis Data dan Informasi Perencanaan Pembangunan Daerah 30000000.00==30000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 30.000.000 0 23.696.500 0 0 0
5 01 02 2.02 0002 Pembinaan dan Pemanfaatan Data dan Informasi Perencanaan Pembangunan Perangkat Daerah 25000000.00==25000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 25.000.000 0 24.874.050 0 0 0
5 01 02 2.02 0003 Penyusunan Profil Pembangunan Daerah Kabupaten/Kota 45000000.00==45000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 45.000.000 0 43.169.350 0 0 0
5 01 02 2.03   Pengendalian, Evaluasi dan Pelaporan Bidang Perencanaan Pembangunan Daerah 172.000.000 0 170.412.800 0 0 0
5 01 02 2.03 0001 Koordinasi Pengendalian Perencanaan dan Pelaksanaan Pembangunan Daerah di Kabupaten/Kota 50080000.00==50080000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 50.080.000 0 49.888.250 0 0 0
5 01 02 2.03 0003 Monitoring, Evaluasi dan Penyusunan Laporan Berkala Pelaksanaan Pembangunan Daerah 121920000.00==121920000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 121.920.000 0 120.524.550 0 0 0
5 01 03     PROGRAM KOORDINASI DAN SINKRONISASI PERENCANAAN PEMBANGUNAN DAERAH 2.725.000.000 0 2.666.302.280 0 0 0
5 01 03 2.01   Koordinasi Perencanaan Bidang Pemerintahan dan Pembangunan Manusia 540.000.000 0 525.293.067 0 0 0
5 01 03 2.01 0001 Koordinasi Penyusunan Dokumen Perencanaan Pembangunan Daerah Bidang Pemerintahan (RPJPD, RPJMD dan RKPD) 60000000.00==60000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 60.000.000 0 58.297.900 0 0 0
5 01 03 2.01 0002 Asistensi Penyusunan Dokumen Perencanaan Pembangunan Perangkat Daerah Bidang Pemerintahan 50000000.00==50000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 50.000.000 0 49.644.000 0 0 0
5 01 03 2.01 0003 Pelaksanaan Monitoring dan Evaluasi Penyusunan Dokumen Perencanaan Pembangunan Perangkat Daerah Bidang Pemerintahan 40000000.00==40000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 40.000.000 0 39.984.200 0 0 0
5 01 03 2.01 0004 Koordinasi Pelaksanaan Sinergitas dan Harmonisasi Perencanaan Pembangunan Daerah Bidang Pemerintahan 25000000.00==25000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 25.000.000 0 24.993.500 0 0 0
5 01 03 2.01 0005 Koordinasi Penyusunan Dokumen Perencanaan Pembangunan Daerah Bidang Pembangunan Manusia (RPJPD, RPJMD dan RKPD) 160000000.00==160000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 160.000.000 0 152.155.038 0 0 0
5 01 03 2.01 0006 Asistensi Penyusunan Dokumen Perencanaan Pembangunan Perangkat Daerah Bidang Pembangunan Manusia 50000000.00==50000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 50.000.000 0 49.879.750 0 0 0
5 01 03 2.01 0007 Pelaksanaan Monitoring dan Evaluasi Penyusunan Dokumen Perencanaan Pembangunan Perangkat Daerah Bidang Pembangunan Manusia 120000000.00==120000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 120.000.000 0 115.487.679 0 0 0
5 01 03 2.01 0008 Koordinasi Pelaksanaan Sinergitas dan Harmonisasi Perencanaan Pembangunan Daerah Bidang Pembangunan Manusia 35000000.00==35000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 35.000.000 0 34.851.000 0 0 0
5 01 03 2.02   Koordinasi Perencanaan Bidang Perekonomian dan SDA (Sumber Daya Alam) 950.000.000 0 915.390.111 0 0 0
5 01 03 2.02 0001 Koordinasi Penyusunan Dokumen Perencanaan Pembangunan Daerah Bidang Perekonomian (RPJPD, RPJMD dan RKPD) 50000000.00==50000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 50.000.000 0 49.868.000 0 0 0
5 01 03 2.02 0002 Asistensi Penyusunan Dokumen Perencanaan Pembangunan Perangkat Daerah Bidang Perekonomian 30000000.00==30000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 30.000.000 0 29.511.000 0 0 0
5 01 03 2.02 0003 Pelaksanaan Monitoring dan Evaluasi Penyusunan Dokumen Perencanaan Pembangunan Perangkat Daerah Bidang Perekonomian 50000000.00==50000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 50.000.000 0 49.915.000 0 0 0
5 01 03 2.02 0004 Koordinasi Pelaksanaan Sinergitas dan Harmonisasi Perencanaan Pembangunan Daerah Bidang Perekonomian 20000000.00==20000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 20.000.000 0 20.000.000 0 0 0
5 01 03 2.02 0005 Koordinasi Penyusunan Dokumen Perencanaan Pembangunan Daerah Bidang SDA (RPJPD, RPJMD dan RKPD) 700000000.00==700000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 700.000.000 0 666.561.111 0 0 0
5 01 03 2.02 0006 Asistensi Penyusunan Dokumen Perencanaan Pembangunan Perangkat Daerah Bidang SDA 30000000.00==30000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 30.000.000 0 29.958.000 0 0 0
5 01 03 2.02 0007 Pelaksanaan Monitoring dan Evaluasi Penyusunan Dokumen Perencanaan Pembangunan Perangkat Daerah Bidang SDA 50000000.00==50000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 50.000.000 0 49.708.000 0 0 0
5 01 03 2.02 0008 Koordinasi Pelaksanaan Sinergitas dan Harmonisasi Perencanaan Pembangunan Daerah Bidang SDA 20000000.00==20000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 20.000.000 0 19.869.000 0 0 0
5 01 03 2.03   Koordinasi Perencanaan Bidang Infrastruktur dan Kewilayahan 1.235.000.000 0 1.225.619.102 0 0 0
5 01 03 2.03 0001 Koordinasi Penyusunan Dokumen Perencanaan Pembangunan Daerah Bidang Infrastruktur (RPJPD, RPJMD dan RKPD) 250000000.00==250000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 250.000.000 0 249.929.500 0 0 0
5 01 03 2.03 0002 Asistensi Penyusunan Dokumen Perencanaan Pembangunan Perangkat Daerah Bidang Infrastruktur 30000000.00==30000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 30.000.000 0 30.000.000 0 0 0
5 01 03 2.03 0003 Pelaksanaan Monitoring dan Evaluasi Penyusunan Dokumen Perencanaan Pembangunan Perangkat Daerah Bidang Infrastruktur 50000000.00==50000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 50.000.000 0 49.970.972 0 0 0
5 01 03 2.03 0004 Koordinasi Pelaksanaan Sinergitas dan Harmonisasi Perencanaan Pembangunan Daerah Bidang Infrastruktur 20000000.00==20000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 20.000.000 0 19.545.500 0 0 0
5 01 03 2.03 0005 Koordinasi Penyusunan Dokumen Perencanaan Pembangunan Daerah Bidang Kewilayahan (RPJPD, RPJMD dan RKPD) 785000000.00==785000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 785.000.000 0 776.942.630 0 0 0
5 01 03 2.03 0006 Asistensi Penyusunan Dokumen Perencanaan Pembangunan Perangkat Daerah Bidang Kewilayahan 35000000.00==35000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 35.000.000 0 34.382.000 0 0 0
5 01 03 2.03 0007 Pelaksanaan Monitoring dan Evaluasi Penyusunan Dokumen Perencanaan Pembangunan Perangkat Daerah Bidang Kewilayahan 45000000.00==45000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 45.000.000 0 44.848.500 0 0 0
5 01 03 2.03 0008 Koordinasi Pelaksanaan Sinergitas dan Harmonisasi Perencanaan Pembangunan Daerah Bidang Kewilayahan 20000000.00==20000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 20.000.000 0 20.000.000 0 0 0
5 05       PENELITIAN DAN PENGEMBANGAN 1.821.315.500 0 1.608.817.799 0 0 0
5 05 02     PROGRAM PENELITIAN DAN PENGEMBANGAN DAERAH 1.821.315.500 0 1.608.817.799 0 0 0
5 05 02 2.01   Penelitian dan Pengembangan Bidang Penyelenggaraan Pemerintahan dan Pengkajian Peraturan 1.114.944.850 0 910.992.550 0 0 0
5 05 02 2.01 0002 Fasilitasi, Pelaksanaan dan Evaluasi Penelitian dan Pengembangan Bidang Pemerintahan Umum 1114944850.00==1114944850.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 1.114.944.850 0 910.992.550 0 0 0
5 05 02 2.02   Penelitian dan Pengembangan Bidang Sosial dan Kependudukan 175.000.000 0 173.086.780 0 0 0
5 05 02 2.02 0001 Penelitian dan Pengembangan Bidang Aspek- Aspek Sosial 175000000.00==175000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 175.000.000 0 173.086.780 0 0 0
5 05 02 2.03   Penelitian dan Pengembangan Bidang Ekonomi dan Pembangunan 285.000.000 0 282.019.400 0 0 0
5 05 02 2.03 0009 Penelitian dan Pengembangan Pekerjaan Umum 285000000.00==285000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 285.000.000 0 282.019.400 0 0 0
5 05 02 2.04   Pengembangan Inovasi dan Teknologi 246.370.650 0 242.719.069 0 0 0
5 05 02 2.04 0001 Penelitian, Pengembangan, dan Perekayasaan di Bidang Teknologi dan Inovasi 141370650.00==141370650.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 141.370.650 0 139.470.618 0 0 0
5 05 02 2.04 0002 Uji Coba dan Penerapan Rancang Bangun/Model Replikasi dan Invensi di Bidang Difusi Inovasi dan Penerapan Teknologi 55000000.00==55000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 55.000.000 0 53.501.300 0 0 0
5 05 02 2.04 0004 Sosialisasi dan Diseminasi Hasil-Hasil Kelitbangan 50000000.00==50000000.00{"kd_urusan":0,"kd_bidang":0,"kd_unit":0,"kd_sub":0,"kd_prog":0,"id_prog":"000","kd_keg":0}SIMPANSET PPTKVERIFIKASI RKABUAT PANJAR 50.000.000 0 49.747.151 0 0 0
TOTAL dan CATATAN KESIMPULAN KABAG ADBANG 11.328.490.168 0 10.906.968.153 0 0 0

Catatan Dokumentasi

  • Laporan RFK: Secara default menampilkan data pada bulan berjalan.
  • Download Excel: Tombol DOWNLOAD EXCEL digunakan untuk mendownload tabel laporan RFK ke format Excel.
  • Pilihan Bulan Realisasi: Digunakan untuk menampilkan laporan RFK sesuai bulan yang dipilih.
  • Simpan Data: Tombol Simpan Data digunakan untuk menyimpan data yang sudah diinput atau diedit oleh user SKPD dan user verfikator.
  • Reset RFK Bulan Sebelumnya: Tombol ini digunakan untuk mengupdate data input sesuai dengan data di bulan sebelumnya. Fitur ini mempermudah user untuk menginput data pada awal bulan, agar tidak perlu menginput satu per satu data mulai dari awal.
  • Catatan Kesimpulan KABAG ADBANG: Berisi kesimpulan dari catatan verifikator yang diisi oleh KABAG ADBANG.
  • Tombol Simpan Merah: Pada sub kegiatan, tombol SIMPAN berwarna merah akan muncul jika ada data yang belum disimpan oleh user SKPD ataupun user verifikator.
  • Total Realisasi Fisik: Perhitungan total realisasi fisik adalah akumulasi realisasi fisik seluruh sub kegiatan dibagi jumlah sub kegiatan yang ada nilai pagu SIMDAnya.
  • Detail Akumulasi Realisasi Fisik: Untuk menampilkan detail akumulasi realisasi fisik per kegiatan, program, dan bidang urusan, klik kotak checkbox Tampilkan Detail Realisasi Fisik. Secara default, akumulasi tidak ditampilkan agar tidak membingungkan user dalam memahami nilai total realisasi fisik.
  • Background Kuning: Baris dengan background kuning menandakan ada yang tidak sama antara pagu sub kegiatan DPA dengan pagu sub kegiatan di SIPD.