|
1.03.0.00.0.00.01.0000 DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | |
16.107.248.506 |
0 |
0 |
|
|
1.03.02.2.01.0026 Rehabilitasi Pintu Air/Bendung Pengendali Banjir | |
347.815.650 |
0 |
0 |
|
|
[#] Perjalanan Dinas dalam daerah | |
2.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Dalam Kota | |
2.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
2.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
2.000.000 |
0 |
0 |
|
Tahun |
|
[#] alat tulis kantor | |
2.829.250 |
0 |
0 |
|
|
[-] Belanja Alat Tulis Kantor | |
2.828.950 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
2.828.950 |
0 |
0 |
|
| 1 |
BallPoint |
Biasa | |
76.000 |
0 |
0 |
|
Buah |
| 2 |
Trigonal Klip |
Isi 10 Kotak | |
715.350 |
0 |
0 |
|
Box |
| 3 |
HVS 70 Gr |
A4 | |
845.000 |
0 |
0 |
|
Rim |
| 4 |
Kertas NCR |
Uk. A4, 3 Ply, 1000 Sheet | |
1.192.600 |
0 |
0 |
|
Box |
|
[-] Pembulatan | |
300 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
300 |
0 |
0 |
|
| 1 |
Pembulatan/Penyesuaian |
| |
300 |
0 |
0 |
|
Rupiah |
|
[#] Belanja Photo Copy | |
2.196.600 |
0 |
0 |
|
|
[-] Belanja Photo Copy | |
2.196.600 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
2.196.600 |
0 |
0 |
|
| 1 |
Photo Copy |
HVS, F4 70 gr | |
2.196.600 |
0 |
0 |
|
Lembar |
|
[#] Belanja bahan komputer | |
2.889.800 |
0 |
0 |
|
|
[-] Belanja Bahan Komputer | |
2.889.800 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer | |
2.889.800 |
0 |
0 |
|
| 1 |
Cartridge |
Cartridge Black | |
983.100 |
0 |
0 |
|
Buah |
| 2 |
Cartridge |
Cartridge Color | |
1.111.950 |
0 |
0 |
|
Buah |
| 3 |
Tinta Printer |
Hitam, 200 Mili Liter | |
420.750 |
0 |
0 |
|
Buah |
| 4 |
Tinta Printer |
Warna, 200 Mili Liter | |
374.000 |
0 |
0 |
|
Buah |
|
[#] Konstruksi | |
300.000.000 |
0 |
0 |
|
|
[-] Rehabilitasi Pintu Air Babar Cs | |
150.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
150.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
150.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Pintu Air Molang 5 Lokasi | |
150.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
150.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
150.000.000 |
0 |
0 |
|
Paket |
|
[#] Jasa Konsultansi Perencanaan | |
20.000.000 |
0 |
0 |
|
|
[-] Jasa Konsultansi Perencanaan Rehabilitasi Pintu Air Babar Cs | |
10.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
10.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
10.000.000 |
0 |
0 |
|
Paket |
|
[-] Jasa Konsultansi Perencanaan Rehabilitasi Pintu Air Molang 5 Lokasi | |
10.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
10.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
10.000.000 |
0 |
0 |
|
Paket |
|
[#] Jsa Konsultansi Pengawasan | |
16.000.000 |
0 |
0 |
|
|
[-] Jasa Konsultansi Pengawasan Rehabilitasi Pintu Air Babar Cs | |
10.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
10.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
10.000.000 |
0 |
0 |
|
Paket |
|
[-] Jasa Konsultansi Pengawasan Rehabilitasi Pintu Air Molang 5 Lokasi | |
6.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
6.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
6.000.000 |
0 |
0 |
|
Paket |
|
[#] Honorarium Pejabat Pengadaad Barang dan Jasa | |
0 |
0 |
0 |
|
|
[-] konstruksi | |
0 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
0 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Pekerjaan Konstruksi/ Barang/ Jasa Lainnya - Ketua |
Nilai pagu dana di atas Rp. 100 Juta s.d. Rp. 200 Juta | |
0 |
0 |
0 |
|
Orang/Paket |
|
[-] Konsultansi | |
0 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
0 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Jasa Konsultansi - Ketua |
Nilai pagu dana s.d. Rp. 50 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
|
[#] Honorarium Tim Pendukukun PPK | |
1.450.000 |
0 |
0 |
|
|
[-] Honorarium Tim Pendukung PPK | |
1.450.000 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
1.450.000 |
0 |
0 |
|
| 1 |
Tim Pendukung PPK 100 jt - 200 jt |
Anggota | |
400.000 |
0 |
0 |
|
Orang/Paket |
| 2 |
Tim Pendukung PPK 100 jt - 200 jt |
Penanggung Jawab | |
550.000 |
0 |
0 |
|
Orang / Paket |
| 3 |
Tim Pendukung PPK 100 jt - 200 jt |
Ketua | |
500.000 |
0 |
0 |
|
Orang/Paket |
|
[#] Honorarium Tim Pelaksana Kegiatan | |
450.000 |
0 |
0 |
|
|
[-] Honorarium Tim Pendukung PPK | |
450.000 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
450.000 |
0 |
0 |
|
| 1 |
Tim Pendukung PPK 100 jt - 200 jt |
Sekretaris | |
450.000 |
0 |
0 |
|
Orang/Paket |
| |
Jumlah Pada Sub Kegiatan | |
347.815.650 |
0 |
0 |
|
|
1.03.02.2.01.0075 Pembinaan dan Pemberdayaan Kelembagaan Pengelolaan SDA Kewenangan Kabupaten/Kota | |
185.862.750 |
0 |
0 |
|
|
[#] Hadiah Kompetisi | |
0 |
0 |
0 |
|
|
[-] Hadiah Kompetisi | |
0 |
0 |
0 |
|
|
Belanja Hadiah yang Bersifat Perlombaan | |
0 |
0 |
0 |
|
| 1 |
Hadiah Lomba/Uang Pembinaan |
Bersifat Perlombaan/Kompetisi/Penghargaan | |
0 |
0 |
0 |
|
Paket |
|
[#] Belanja Barang Pakai Habis | |
4.396.250 |
0 |
0 |
|
|
[-] Belanja ATK | |
4.396.250 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
4.396.250 |
0 |
0 |
|
| 1 |
BallPoint |
Biasa | |
432.000 |
0 |
0 |
|
Buah |
| 2 |
Binder Clip |
No. 260 | |
490.200 |
0 |
0 |
|
Dus |
| 3 |
Penghapus |
Kecil | |
162.500 |
0 |
0 |
|
Buah |
| 4 |
Buku Block Note |
Garis / isi 40 Lembar | |
232.200 |
0 |
0 |
|
Buku |
| 5 |
Buku Folio |
Isi 100 Lembar | |
1.578.200 |
0 |
0 |
|
Buah |
| 6 |
Buku Tulis |
38 Lembar | |
160.000 |
0 |
0 |
|
Buah |
| 7 |
Stop Map |
Kantong/ plastik kancing | |
226.800 |
0 |
0 |
|
Buah |
| 8 |
Penggaris |
30 cm | |
190.000 |
0 |
0 |
|
Buah |
| 9 |
Isi Stapples |
1210, Kecil | |
184.450 |
0 |
0 |
|
Dus |
| 10 |
HVS 70 Gr |
F4 | |
219.300 |
0 |
0 |
|
Rim |
| 11 |
HVS 70 Gr |
A4 | |
520.000 |
0 |
0 |
|
Rim |
| 12 |
Kertas NCR |
Uk. A4, 3 Ply, 1000 Sheet | |
0 |
0 |
0 |
|
Box |
| 13 |
Pembulatan/Penyesuaian |
| |
600 |
0 |
0 |
|
Rupiah |
|
[#] Bahan Cetak | |
2.495.050 |
0 |
0 |
|
|
[-] Bahan Cetak | |
2.495.050 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
2.495.050 |
0 |
0 |
|
| 1 |
cetak banner |
print digital (1mx1m) | |
412.100 |
0 |
0 |
|
M2 |
| 2 |
Photo Copy |
HVS, F4 70 gr | |
2.082.850 |
0 |
0 |
|
Lembar |
| 3 |
Pembulatan/Penyesuaian |
| |
100 |
0 |
0 |
|
Rupiah |
|
[-] Pembulatan | |
0 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
0 |
0 |
0 |
|
| 1 |
Pembulatan/Penyesuaian |
| |
0 |
0 |
0 |
|
|
|
[#] Benda Pos | |
746.550 |
0 |
0 |
|
|
[-] Benda Pos | |
746.550 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Benda Pos | |
746.550 |
0 |
0 |
|
| 1 |
Materai |
Materai 10.000 | |
746.550 |
0 |
0 |
|
Buah |
|
[#] Bahan Komputer | |
1.295.400 |
0 |
0 |
|
|
[-] Bahan Komputer | |
1.295.400 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer | |
1.295.400 |
0 |
0 |
|
| 1 |
Tinta Printer |
No. 664 (Black); Ukuran 70 Ml | |
539.750 |
0 |
0 |
|
Buah |
| 2 |
Tinta Printer |
No. 664 (Warna); Ukuran 70 Ml | |
755.650 |
0 |
0 |
|
Buah |
|
[#] Belanja Mamin | |
22.894.500 |
0 |
0 |
|
|
[-] Belanja Mamin | |
22.894.500 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
22.894.500 |
0 |
0 |
|
| 1 |
Nasi Kotak |
Biasa | |
13.750.000 |
0 |
0 |
|
Box |
| 2 |
Snack Kotak |
Biasa | |
6.407.500 |
0 |
0 |
|
Box |
| 3 |
Paket Coffe break |
Teh, Kopi, Snack | |
2.737.000 |
0 |
0 |
|
Paket |
|
[#] Honorarium Narasumber atau Pembahas, Moderator, Pembawa Acara dan Panitia | |
70.800.000 |
0 |
0 |
|
|
[-] Honorarium Narasumber atau Pembahas, Moderator, Pembawa Acara dan Panitia | |
70.800.000 |
0 |
0 |
|
|
Honorarium Narasumber atau Pembahas, Moderator, Pembawa Acara, dan Panitia | |
70.800.000 |
0 |
0 |
|
| 1 |
Honorarium Narasumber |
Dalam Kota | |
36.900.000 |
0 |
0 |
|
Orang / Jam |
| 2 |
Honorarium Narasumber |
Narasumber Non PNS : organisasi profesi, surveior | |
23.400.000 |
0 |
0 |
|
Orang / Jam |
| 3 |
Moderator |
Segala Kegiatan | |
10.500.000 |
0 |
0 |
|
Orang / Kali |
|
[#] Honorarium Panitia Pelaksanaan Kegiatan Pembinaan HIPPA/GHIPPA & Bimbingan Teknis Petugas Operasi dan Pemeliharaan Jaringan Irigasi | |
20.300.000 |
0 |
0 |
|
|
[-] Honorarium Panitia Pelaksanaan Kegiatan Pembinaan HIPPA/GHIPPA & Bimbingan Teknis Petugas Operasi dan Pemeliharaan Jaringan Irigasi | |
20.300.000 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
20.300.000 |
0 |
0 |
|
| 1 |
Honorarium Panitia Pelaksana Kegiatan - SK Panitia pelaksana ditandatangani Kepala SKPD (PA/KPA) |
Penasehat / Pembina / Pengarah | |
4.200.000 |
0 |
0 |
|
Orang / Kegiatan |
| 2 |
Honorarium Panitia Pelaksana Kegiatan - SK Panitia pelaksana ditandatangani Kepala SKPD (PA/KPA) |
Ketua | |
3.500.000 |
0 |
0 |
|
Orang / Kegiatan |
| 3 |
Honorarium Panitia Pelaksana Kegiatan - SK Panitia pelaksana ditandatangani Kepala SKPD (PA/KPA) |
Sekretaris | |
2.800.000 |
0 |
0 |
|
Orang / Kegiatan |
| 4 |
Honorarium Panitia Pelaksana Kegiatan - SK Panitia pelaksana ditandatangani Kepala SKPD (PA/KPA) |
Anggota/Setara | |
9.800.000 |
0 |
0 |
|
Orang / Kegiatan |
|
[#] Honorarium Panitia Pelaksanaan Kegiatan Pembinaan HIPPA/GHIPPA & Bimbingan Teknis Petugas Operasi dan Pemeliharaan Jaringan Irigasi | |
3.850.000 |
0 |
0 |
|
|
[-] Honorarium Panitia Pelaksanaan Kegiatan Pembinaan HIPPA/GHIPPA & Bimbingan Teknis Petugas Operasi dan Pemeliharaan Jaringan Irigasi | |
3.850.000 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
3.850.000 |
0 |
0 |
|
| 1 |
Honorarium Panitia Pelaksana Kegiatan - SK Panitia pelaksana ditandatangani Kepala SKPD (PA/KPA) |
Penanggung Jawab | |
3.850.000 |
0 |
0 |
|
Orang / Kegiatan |
|
[#] Belanja Jasa Publikasi | |
3.500.000 |
0 |
0 |
|
|
[-] Belanaja Jasa Publikasi | |
3.500.000 |
0 |
0 |
|
|
Belanja Jasa Iklan/Reklame, Film, dan Pemotretan | |
3.500.000 |
0 |
0 |
|
| 1 |
Tarif Iklan - (Publikasi) |
4 Kolom X 200 Mm; Hitam Putih; 1 X Tayang; Koran Jurnal | |
1.500.000 |
0 |
0 |
|
Paket |
| 2 |
Publikasi Media Online Lokal |
1 | |
2.000.000 |
0 |
0 |
|
Per Tayang |
|
[#] Belanja Lembur | |
30.360.000 |
0 |
0 |
|
|
[-] Belanja Lembur | |
30.360.000 |
0 |
0 |
|
|
Belanja Lembur | |
30.360.000 |
0 |
0 |
|
| 1 |
Uang Makan Lembur PNS |
Diberikan setelah bekerja lembur sekurang- kurangnya 2 Jam secara berturut-turut untuk semua golongan. | |
10.350.000 |
0 |
0 |
|
Orang |
| 2 |
Uang Lembur |
Golongan II | |
7.200.000 |
0 |
0 |
|
Orang / Jam |
| 3 |
Uang Lembur |
Golongan III | |
9.930.000 |
0 |
0 |
|
Orang / Jam |
| 4 |
Uang Lembur |
Golongan IV | |
2.880.000 |
0 |
0 |
|
Orang / Jam |
|
[#] Sewa Kendaraan | |
4.500.000 |
0 |
0 |
|
|
[-] Sewa Kendaraan | |
4.500.000 |
0 |
0 |
|
|
Belanja Sewa Kendaraan Bermotor Penumpang | |
4.500.000 |
0 |
0 |
|
| 1 |
Sewa Kendaraan Roda Empat |
Keluar Wilayah Kabupaten, Supir, BBM | |
4.500.000 |
0 |
0 |
|
Unit |
|
[#] SPPD Luar Daerah | |
5.000.000 |
0 |
0 |
|
|
[-] SPPD Luar Daerah | |
5.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Biasa | |
5.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Luar Daerah |
| |
5.000.000 |
0 |
0 |
|
Tahun |
|
[#] Perjalanan Dinas Dalam Daerah | |
15.725.000 |
0 |
0 |
|
|
[-] Bantuan Transport | |
12.225.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
12.225.000 |
0 |
0 |
|
| 1 |
Bantuan Transport |
Non PNS, peserta sosialisasi, penyuluhan, dan sejenisnya | |
12.225.000 |
0 |
0 |
|
Orang / Hari |
|
[-] Perjalanan Dinas Dalam Daerah | |
3.500.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
3.500.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
3.500.000 |
0 |
0 |
|
Tahun |
|
[#] Pembulatan | |
0 |
0 |
0 |
|
|
[-] Pembulatan | |
0 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
0 |
0 |
0 |
|
| 1 |
Pembulatan/Penyesuaian |
| |
0 |
0 |
0 |
|
|
| |
Jumlah Pada Sub Kegiatan | |
185.862.750 |
0 |
0 |
|
|
1.03.02.2.01.0114 Rehabilitasi Embung dan Penampungan Air Lainnya | |
384.411.950 |
0 |
0 |
|
|
[#] Perjalanan Dinas Dalam Daerah | |
1.500.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Dalam Daerah | |
1.500.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
1.500.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
1.500.000 |
0 |
0 |
|
Tahun |
|
[#] Belanja Alat Tulis Kantor | |
2.957.850 |
0 |
0 |
|
|
[-] Alat Tulis Kantor | |
2.957.850 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
2.957.850 |
0 |
0 |
|
| 1 |
Ordner |
Folio | |
226.500 |
0 |
0 |
|
Buah |
| 2 |
Snelhecter Map |
Plastik | |
202.500 |
0 |
0 |
|
Buah |
| 3 |
Stop Map |
Kertas | |
215.000 |
0 |
0 |
|
Buah |
| 4 |
Pembulatan/Penyesuaian |
| |
50 |
0 |
0 |
|
Rupiah |
| 5 |
HVS 70 Gr |
F4 | |
146.200 |
0 |
0 |
|
Rim |
| 6 |
HVS 70 Gr |
A4 | |
975.000 |
0 |
0 |
|
Rim |
| 7 |
Kertas NCR |
Uk. A4, 3 Ply, 1000 Sheet | |
1.192.600 |
0 |
0 |
|
Box |
|
[#] Belanja Penggandaan | |
3.231.200 |
0 |
0 |
|
|
[-] Photo Copy | |
3.231.200 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
3.231.200 |
0 |
0 |
|
| 1 |
Photo Copy |
HVS A4/F4 70 gr | |
3.231.200 |
0 |
0 |
|
Lembar |
|
[#] Belanja Bahan Komputer | |
2.456.900 |
0 |
0 |
|
|
[-] Bahan Komputer | |
2.456.900 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer | |
2.456.900 |
0 |
0 |
|
| 1 |
Cartridge |
Cartridge Black | |
655.400 |
0 |
0 |
|
Buah |
| 2 |
Cartridge |
Cartridge Color | |
741.300 |
0 |
0 |
|
Buah |
| 3 |
Tinta Printer |
Ukuran 200 Ml (Hitam) | |
530.100 |
0 |
0 |
|
Buah |
| 4 |
Tinta Printer |
Ukuran 200 Ml (Warna) | |
530.100 |
0 |
0 |
|
Buah |
|
[#] Rehabilitasi Embung | |
330.000.000 |
0 |
0 |
|
|
[-] Rehabilitasi Embung Jarakan | |
130.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Waduk Irigasi | |
130.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
130.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Embung Joketro (Lanjutan) | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Waduk Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Konsultansi Perencanaan | |
22.000.000 |
0 |
0 |
|
|
[-] Perencanaan (DED) Rehabilitasi Embung | |
22.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Waduk Irigasi | |
22.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
22.000.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Konsultansi Pengawasan | |
15.000.000 |
0 |
0 |
|
|
[-] Pengawasan (Supervisi) Rehabilitasi Embung | |
15.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Waduk Irigasi | |
15.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
15.000.000 |
0 |
0 |
|
Paket |
|
[#] Honorarium Pejabat Pengadaan | |
0 |
0 |
0 |
|
|
[-] Honorarium Pejabat Pengadaan Konstruksi | |
0 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
0 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Pekerjaan Konstruksi/ Barang/ Jasa Lainnya - Ketua |
Nilai pagu dana di atas Rp. 100 Juta s.d. Rp. 200 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
|
[-] Honorarium Pejabat Pengadaan Konsultansi | |
0 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
0 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Jasa Konsultansi - Ketua |
Nilai pagu dana s.d. Rp. 50 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
|
[#] Belanja Makanan dan Minuman Rapat | |
1.466.000 |
0 |
0 |
|
|
[-] Makanan dan Minuman Rapat | |
1.466.000 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
1.466.000 |
0 |
0 |
|
| 1 |
Nasi Kotak |
Biasa | |
1.000.000 |
0 |
0 |
|
Box |
| 2 |
Snack Kotak |
Biasa | |
466.000 |
0 |
0 |
|
Box |
|
[#] Honorarium Pelaksana Kegiatan | |
2.300.000 |
0 |
0 |
|
|
[-] Honorarium Tim Pendukung PPK 100 jt - 200 jt | |
2.300.000 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
2.300.000 |
0 |
0 |
|
| 1 |
Tim Pendukung PPK 100 jt - 200 jt |
Penanggung Jawab | |
550.000 |
0 |
0 |
|
Orang / Paket |
| 2 |
Tim Pendukung PPK 100 jt - 200 jt |
Ketua | |
500.000 |
0 |
0 |
|
Orang / Paket |
| 3 |
Tim Pendukung PPK 100 jt - 200 jt |
Sekretaris | |
450.000 |
0 |
0 |
|
Orang / Bulan |
| 4 |
Tim Pendukung PPK 100 jt - 200 jt |
Anggota | |
800.000 |
0 |
0 |
|
Orang / Paket |
|
[#] Belanja Publikasi | |
1.500.000 |
0 |
0 |
|
|
[-] Belanja Publikasi | |
1.500.000 |
0 |
0 |
|
|
Belanja Jasa Iklan/Reklame, Film, dan Pemotretan | |
1.500.000 |
0 |
0 |
|
| 1 |
Tarif Iklan - (Publikasi) |
4 Kolom X 200 Mm; Hitam Putih; 1 X Tayang; Koran Jurnal | |
1.500.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Sewa Kendaraan | |
0 |
0 |
0 |
|
|
[-] Sewa Kendaraan | |
0 |
0 |
0 |
|
|
Belanja Sewa Kendaraan Bermotor Penumpang | |
0 |
0 |
0 |
|
| 1 |
Sewa Kendaraan Roda Empat |
Keluar Wilayah Kabupaten, Supir, BBM | |
0 |
0 |
0 |
|
Hari |
|
[#] Perjalanan Dinas Luar Daerah | |
2.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Luar Daerah | |
2.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Biasa | |
2.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Luar Daerah |
| |
2.000.000 |
0 |
0 |
|
Tahun |
| |
Jumlah Pada Sub Kegiatan | |
384.411.950 |
0 |
0 |
|
|
1.03.02.2.01.0118 Penyusunan Pola dan Rencana Pengelolaan SDA WS Kewenangan Kabupaten/Kota | |
443.825.300 |
0 |
0 |
|
|
[#] Perjalanan Dinas Dalam Kota | |
5.500.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Dalam Kota | |
5.500.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
5.500.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
5.500.000 |
0 |
0 |
|
Tahun |
|
[#] Belanja BBM | |
6.216.000 |
0 |
0 |
|
|
[-] Belanja BBM | |
6.216.000 |
0 |
0 |
|
|
Belanja Bahan-Bahan Bakar dan Pelumas | |
6.216.000 |
0 |
0 |
|
| 1 |
Pertamax |
| |
6.216.000 |
0 |
0 |
|
Liter |
|
[#] Belanja Alat Tulis Kantor | |
4.910.500 |
0 |
0 |
|
|
[-] Belanja Alat Tulis Kantor | |
4.910.500 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
4.910.500 |
0 |
0 |
|
| 1 |
BallPoint |
Boxy | |
875.000 |
0 |
0 |
|
Buah |
| 2 |
Refill Ballpoint |
Biru/ Hitam | |
600.000 |
0 |
0 |
|
Buah |
| 3 |
Binder Clip |
No. 260 | |
612.750 |
0 |
0 |
|
Dus |
| 4 |
Snelhecter Map |
Plastik | |
900.000 |
0 |
0 |
|
Buah |
| 5 |
Snelhecter Map |
Kertas | |
405.000 |
0 |
0 |
|
Buah |
| 6 |
Pembulatan/Penyesuaian |
| |
150 |
0 |
0 |
|
Rupiah |
| 7 |
HVS 70 Gr |
A4 | |
325.000 |
0 |
0 |
|
Rim |
| 8 |
Kertas NCR |
Uk. A4, 3 Ply, 1000 Sheet | |
1.192.600 |
0 |
0 |
|
Box |
|
[#] Photo Copy | |
4.655.350 |
0 |
0 |
|
|
[-] Photo Copy | |
4.655.350 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
4.655.350 |
0 |
0 |
|
| 1 |
Photo Copy |
HVS, F4 70 gr | |
4.655.350 |
0 |
0 |
|
Lembar |
|
[#] Belanja Materai | |
474.000 |
0 |
0 |
|
|
[-] Belanja Materai | |
474.000 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Benda Pos | |
474.000 |
0 |
0 |
|
| 1 |
Materai |
Materai 10.000 | |
474.000 |
0 |
0 |
|
Buah |
|
[#] Bahan Komputer | |
8.450.950 |
0 |
0 |
|
|
[-] Belanja Bahan Komputer | |
8.450.950 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer | |
8.450.950 |
0 |
0 |
|
| 1 |
Cartridge |
Cartridge Black | |
3.277.000 |
0 |
0 |
|
Buah |
| 2 |
Cartridge |
Cartridge Color | |
2.965.200 |
0 |
0 |
|
Buah |
| 3 |
Tinta Printer |
Ukuran 200 Ml (Hitam) | |
1.325.250 |
0 |
0 |
|
Buah |
| 4 |
Tinta Printer |
Ukuran 200 Ml (Warna) | |
883.500 |
0 |
0 |
|
Buah |
|
[#] Honorarium Pengadaan Barang dan Jasa | |
0 |
0 |
0 |
|
|
[-] Honorarium Pengadaaan Barang dan Jasa | |
0 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
0 |
0 |
0 |
|
| 1 |
Ketua |
Nilai pagu dana di atas Rp. 50 Juta s.d. 100 Juta | |
0 |
0 |
0 |
|
Orang/Paket |
|
[#] Belanja Makan Minum | |
1.832.500 |
0 |
0 |
|
|
[-] Belanja Makan dan Minum | |
1.832.500 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
1.832.500 |
0 |
0 |
|
| 1 |
Nasi Kotak |
Biasa | |
1.250.000 |
0 |
0 |
|
Box |
| 2 |
Snack Kotak |
Biasa | |
582.500 |
0 |
0 |
|
Box |
|
[#] Belanja Lembur | |
7.336.000 |
0 |
0 |
|
|
[-] Belanja Lembur | |
7.336.000 |
0 |
0 |
|
|
Belanja Lembur | |
7.336.000 |
0 |
0 |
|
| 1 |
Uang Makan Lembur PNS |
Diberikan setelah bekerja lembur sekurang- kurangnya 2 Jam secara berturut-turut untuk semua golongan. | |
960.000 |
0 |
0 |
|
Orang / Hari |
| 2 |
Uang Makan Lembur Non PNS |
Diberikan setelah bekerja lembur sekurang- kurangnya 2 Jam secara berturut-turut untuk non PNS | |
330.000 |
0 |
0 |
|
Orang / Hari |
| 3 |
Uang Lembur |
Golongan II | |
240.000 |
0 |
0 |
|
Orang / Jam |
| 4 |
Uang Lembur |
Golongan III | |
3.570.000 |
0 |
0 |
|
Orang / Jam |
| 5 |
Uang Lembur |
Golongan IV | |
1.116.000 |
0 |
0 |
|
Orang / Jam |
| 6 |
Uang Lembur |
Non ASN | |
1.120.000 |
0 |
0 |
|
Orang / Jam |
|
[#] Belanja Sewa | |
2.450.000 |
0 |
0 |
|
|
[-] Sewa Dalam Daerah | |
650.000 |
0 |
0 |
|
|
Belanja Sewa Kendaraan Bermotor Penumpang | |
650.000 |
0 |
0 |
|
| 1 |
Sewa Kendaraan Roda Empat |
Dalam Wilayah Kabupaten, Supir, BBM | |
650.000 |
0 |
0 |
|
Unit |
|
[-] Sewa Luar Kota | |
1.800.000 |
0 |
0 |
|
|
Belanja Sewa Kendaraan Bermotor Penumpang | |
1.800.000 |
0 |
0 |
|
| 1 |
Sewa Kendaraan Roda Empat |
Keluar Wilayah Kabupaten, Supir, BBM | |
1.800.000 |
0 |
0 |
|
Unit |
|
[#] Belanja Jasa Konsultansi | |
400.000.000 |
0 |
0 |
|
|
[-] Penilaian Aset Daerah Irigasi UPTD Pengairan Purwodadi - Taji | |
80.000.000 |
0 |
0 |
|
|
Belanja Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air | |
80.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
80.000.000 |
0 |
0 |
|
Paket |
|
[-] Penyusunan e-PAKSI(Elektronik Pengelolaan Aset dan Kinerja Sistem Irigasi) Kabupaten Magetan | |
80.000.000 |
0 |
0 |
|
|
Belanja Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air | |
80.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
80.000.000 |
0 |
0 |
|
Paket |
|
[-] Penyusunan Rencana Tata Tanam Global (RTTG) Kabupaten Magetan | |
80.000.000 |
0 |
0 |
|
|
Belanja Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air | |
80.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
80.000.000 |
0 |
0 |
|
Paket |
|
[-] Penyusunan Update Peta Spasial Daerah Irigasi Kabupaten Magetan | |
80.000.000 |
0 |
0 |
|
|
Belanja Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air | |
80.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
80.000.000 |
0 |
0 |
|
Paket |
|
[-] Update Skema Eksploitasi Irigasi dan Skema Bangunan Daerah Irigasi Kabupaten Magetan | |
80.000.000 |
0 |
0 |
|
|
Belanja Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air | |
80.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
80.000.000 |
0 |
0 |
|
Paket |
|
[#] Perjalanan Dinas Luar Kota | |
2.000.000 |
0 |
0 |
|
|
[-] Perjalanan dinas Luar kota | |
2.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Biasa | |
2.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Luar Daerah |
| |
2.000.000 |
0 |
0 |
|
Tahun |
| |
Jumlah Pada Sub Kegiatan | |
443.825.300 |
0 |
0 |
|
|
1.03.02.2.01.0121 Pembangunan Embung dan Penampung Air Lainnya | |
1.737.539.000 |
0 |
0 |
|
|
[#] Perjalanan Dinas Dalam Daerah | |
2.500.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Dalam Daerah | |
2.500.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
2.500.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
2.500.000 |
0 |
0 |
|
Tahun |
|
[#] Belanja Alat Tulis Kantor | |
3.794.150 |
0 |
0 |
|
|
[-] Alat Tulis Kantor | |
3.794.150 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
3.794.150 |
0 |
0 |
|
| 1 |
BallPoint |
Biasa | |
48.000 |
0 |
0 |
|
Buah |
| 2 |
Binder Clip |
No. 155 | |
38.700 |
0 |
0 |
|
Dus |
| 3 |
Buku Agenda KM |
Isi 200 Lembar | |
36.700 |
0 |
0 |
|
Buah |
| 4 |
Ordner |
Folio | |
188.750 |
0 |
0 |
|
Buah |
| 5 |
Snelhecter Map |
Plastik | |
225.000 |
0 |
0 |
|
Buah |
| 6 |
Stop Map |
Kertas | |
322.500 |
0 |
0 |
|
Buah |
| 7 |
Pembulatan/Penyesuaian |
| |
100 |
0 |
0 |
|
Rupiah |
| 8 |
HVS 70 Gr |
F4 | |
365.500 |
0 |
0 |
|
Rim |
| 9 |
HVS 70 Gr |
A4 | |
780.000 |
0 |
0 |
|
Rim |
| 10 |
Kertas NCR |
Uk. A4, 3 Ply, 1000 Sheet | |
1.788.900 |
0 |
0 |
|
Box |
|
[#] Belanja Photo Copy | |
5.702.550 |
0 |
0 |
|
|
[-] Photo Copy | |
5.702.550 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
5.702.550 |
0 |
0 |
|
| 1 |
Photo Copy |
HVS A4/F4 70 gr | |
5.702.550 |
0 |
0 |
|
Lembar |
|
[#] Belanja Bahan Komputer | |
5.982.800 |
0 |
0 |
|
|
[-] Bahan Komputer | |
5.982.800 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer | |
5.982.800 |
0 |
0 |
|
| 1 |
Cartridge |
Cartridge Black | |
1.638.500 |
0 |
0 |
|
Buah |
| 2 |
Cartridge |
Cartridge Color | |
2.223.900 |
0 |
0 |
|
Buah |
| 3 |
Tinta Printer |
Ukuran 200 Ml (Hitam) | |
1.060.200 |
0 |
0 |
|
Buah |
| 4 |
Tinta Printer |
Ukuran 200 Ml (Warna) | |
1.060.200 |
0 |
0 |
|
Buah |
|
[#] Pembangunan Embung | |
1.550.000.000 |
0 |
0 |
|
|
[-] Pembangunan Embung Kawedanan, Terung | |
500.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Waduk Irigasi | |
500.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
500.000.000 |
0 |
0 |
|
Paket |
|
[-] Pembangunan Embung Sidowayah | |
650.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Waduk Irigasi | |
650.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
650.000.000 |
0 |
0 |
|
Paket |
|
[-] Pembangunan Embung Klubuk (Lanjutan) | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Waduk Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Pembangunan Embung Mantren | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Waduk Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Konsultansi Perencanaan | |
52.000.000 |
0 |
0 |
|
|
[-] Perencanaan (DED) Pembangunan Embung | |
52.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Waduk Irigasi | |
52.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
52.000.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Konsultansi Pengawasan | |
53.000.000 |
0 |
0 |
|
|
[-] Pengawasan (Supervisi) Pembangunan Embung | |
38.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Waduk Irigasi | |
38.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
38.000.000 |
0 |
0 |
|
Paket |
|
[-] Pengawasan (Supervisi) Pembangunan Embung Paket 1 | |
15.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Waduk Irigasi | |
15.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
15.000.000 |
0 |
0 |
|
Paket |
|
[#] Honorarium Pejabat Pengadaan | |
0 |
0 |
0 |
|
|
[-] Pejabat Pengadaan Konsultansi | |
0 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
0 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Jasa Konsultansi - Ketua |
Nilai pagu dana s.d. Rp. 50 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
| 2 |
Pejabat Pengadaan Jasa Konsultansi - Ketua |
Nilai pagu dana di atas Rp. 50 Juta s.d. Rp. 100 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
|
[#] Belanja Makanan dan Minuman Rapat | |
1.099.500 |
0 |
0 |
|
|
[-] Belanja Makanan dan Minuman Rapat | |
1.099.500 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
1.099.500 |
0 |
0 |
|
| 1 |
Nasi Kotak |
Biasa | |
750.000 |
0 |
0 |
|
Box |
| 2 |
Snack Kotak |
Biasa | |
349.500 |
0 |
0 |
|
Box |
|
[#] Honorarium Pelaksana Kegiatan | |
5.600.000 |
0 |
0 |
|
|
[-] Honorarium Tim Pendukung PPK 500 jt - 1 M | |
3.300.000 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
3.300.000 |
0 |
0 |
|
| 1 |
Tim Pendukung PPK 500 jt - 1 M |
Penanggung Jawab | |
750.000 |
0 |
0 |
|
Orang / Paket |
| 2 |
Tim Pendukung PPK 500 jt - 1 M |
Ketua | |
700.000 |
0 |
0 |
|
Orang / Paket |
| 3 |
Tim Pendukung PPK 500 jt - 1 M |
Sekretaris | |
650.000 |
0 |
0 |
|
Orang / Paket |
| 4 |
Tim Pendukung PPK 500 jt - 1 M |
Anggota | |
1.200.000 |
0 |
0 |
|
Orang / Paket |
|
[-] Honorarium Tim Pendukung PPK 100 jt - 200 jt | |
2.300.000 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
2.300.000 |
0 |
0 |
|
| 1 |
Tim Pendukung PPK 100 jt - 200 jt |
Penanggung Jawab | |
550.000 |
0 |
0 |
|
Orang / Paket |
| 2 |
Tim Pendukung PPK 100 jt - 200 jt |
Ketua | |
500.000 |
0 |
0 |
|
Orang / Paket |
| 3 |
Tim Pendukung PPK 100 jt - 200 jt |
Sekretaris | |
450.000 |
0 |
0 |
|
Orang / Paket |
| 4 |
Tim Pendukung PPK 100 jt - 200 jt |
Anggota | |
800.000 |
0 |
0 |
|
Orang / Paket |
|
[#] Honorarium Penyuluhan dan Pendampingan | |
20.000.000 |
0 |
0 |
|
|
[-] Pendampingan Hukum | |
20.000.000 |
0 |
0 |
|
|
Honorarium Penyuluhan atau Pendampingan | |
20.000.000 |
0 |
0 |
|
| 1 |
Pendampingan Hukum |
- | |
20.000.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Publikasi | |
1.500.000 |
0 |
0 |
|
|
[-] Belanja Publikasi | |
1.500.000 |
0 |
0 |
|
|
Belanja Jasa Iklan/Reklame, Film, dan Pemotretan | |
1.500.000 |
0 |
0 |
|
| 1 |
Tarif Iklan - (Publikasi) |
4 Kolom X 200 Mm; Hitam Putih; 1 X Tayang; Koran Jurnal | |
1.500.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Lembur | |
9.360.000 |
0 |
0 |
|
|
[-] Belanja Lembur | |
9.360.000 |
0 |
0 |
|
|
Belanja Lembur | |
9.360.000 |
0 |
0 |
|
| 1 |
Uang Makan Lembur PNS |
Diberikan setelah bekerja lembur sekurang- kurangnya 2 Jam secara berturut-turut untuk semua golongan. | |
1.590.000 |
0 |
0 |
|
Orang |
| 2 |
Uang Lembur |
Golongan II | |
1.440.000 |
0 |
0 |
|
Orang / Jam |
| 3 |
Uang Lembur |
Golongan III | |
5.250.000 |
0 |
0 |
|
Orang / Jam |
| 4 |
Uang Lembur |
Golongan IV | |
1.080.000 |
0 |
0 |
|
Orang / Jam |
|
[#] Sewa Kendaraan | |
0 |
0 |
0 |
|
|
[-] Sewa Kendaraan | |
0 |
0 |
0 |
|
|
Belanja Sewa Kendaraan Bermotor Penumpang | |
0 |
0 |
0 |
|
| 1 |
Sewa Kendaraan Roda Empat |
Keluar Wilayah Kabupaten, Supir, BBM | |
0 |
0 |
0 |
|
Hari |
|
[#] Perjalanan Dinas Luar Daerah | |
5.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Luar Daerah | |
5.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Biasa | |
5.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Luar Daerah |
| |
5.000.000 |
0 |
0 |
|
Tahun |
|
[#] Belanja Konsultansi Perencanaan | |
22.000.000 |
0 |
0 |
|
|
[-] Perencanaan (DED) Pembangunan Embung Paket 1 | |
22.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Waduk Irigasi | |
22.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
22.000.000 |
0 |
0 |
|
Paket |
| |
Jumlah Pada Sub Kegiatan | |
1.737.539.000 |
0 |
0 |
|
|
1.03.02.2.01.0125 Pembangunan Pintu Air/Bendung Pengendali Banjir | |
297.711.100 |
0 |
0 |
|
|
[#] Perjalanan Dinas | |
2.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Dalam Kota | |
2.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
2.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
2.000.000 |
0 |
0 |
|
Tahun |
|
[#] Alat Tulis Kantor | |
3.003.350 |
0 |
0 |
|
|
[-] Belanja Alat Tulis Kantor | |
3.003.150 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
3.003.150 |
0 |
0 |
|
| 1 |
BallPoint |
Biasa | |
40.000 |
0 |
0 |
|
Buah |
| 2 |
Binder Clip |
No. 111 | |
580.500 |
0 |
0 |
|
Box |
| 3 |
Trigonal Klip |
Isi 10 Kotak | |
941.250 |
0 |
0 |
|
Box |
| 4 |
Ordner |
Folio | |
53.800 |
0 |
0 |
|
Buah |
| 5 |
HVS 70 Gr |
A4 | |
195.000 |
0 |
0 |
|
Rim |
| 6 |
Kertas NCR |
Uk. A4, 3 Ply, 1000 Sheet | |
1.192.600 |
0 |
0 |
|
Box |
|
[-] Pembulatan | |
200 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
200 |
0 |
0 |
|
| 1 |
Pembulatan/Penyesuaian |
| |
200 |
0 |
0 |
|
Rupiah |
|
[#] Belanja Photo copy | |
2.839.200 |
0 |
0 |
|
|
[-] Photo Copy | |
2.839.200 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
2.839.200 |
0 |
0 |
|
| 1 |
Photo Copy |
HVS, F4 70 gr | |
2.839.200 |
0 |
0 |
|
Lembar |
|
[#] Belanja Bahan Komputer | |
2.368.550 |
0 |
0 |
|
|
[-] Belanja Bahan Komputer | |
2.368.550 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer | |
2.368.550 |
0 |
0 |
|
| 1 |
Cartridge |
Cartridge Black | |
655.400 |
0 |
0 |
|
Buah |
| 2 |
Cartridge |
Cartridge Color | |
741.300 |
0 |
0 |
|
Buah |
| 3 |
Tinta Printer |
Ukuran 200 Ml (Hitam) | |
441.750 |
0 |
0 |
|
Buah |
| 4 |
Tinta Printer |
Ukuran 200 Ml (Warna) | |
530.100 |
0 |
0 |
|
Buah |
|
[#] Belanja Konstruksi | |
100.000.000 |
0 |
0 |
|
|
[-] Pembangunan Pintu Air Embung Sidowayah Cs | |
100.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
100.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
100.000.000 |
0 |
0 |
|
Paket |
|
[#] Jasa Konsultansi Perencanaan | |
20.000.000 |
0 |
0 |
|
|
[-] Jasa Konsultansi Perencanaan Pembangunan Pintu Air Embung Sidowayah Cs | |
10.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
10.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
10.000.000 |
0 |
0 |
|
Paket |
|
[-] Jasa Konsultansi Perencanaan Pembangunan Pintu Air Ngurmo 5 Lokasi | |
10.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
10.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
10.000.000 |
0 |
0 |
|
Paket |
|
[#] Jasa Konsultansi Pengawasan | |
16.000.000 |
0 |
0 |
|
|
[-] Jasa Konsultansi Pengawasan Pembangunan Pintu Air Embung Sidowayah Cs | |
10.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
10.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
10.000.000 |
0 |
0 |
|
Paket |
|
[-] Jasa Konsultansi Pengawasan Pembangunan Pintu Air Ngurmo 5 Lokasi | |
6.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
6.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
6.000.000 |
0 |
0 |
|
Paket |
|
[#] Honorarium Pejabat Pengadan | |
0 |
0 |
0 |
|
|
[-] konstruksi | |
0 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
0 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Pekerjaan Konstruksi/ Barang/ Jasa Lainnya - Ketua |
Nilai pagu dana di atas Rp. 100 Juta s.d. Rp. 200 Juta | |
0 |
0 |
0 |
|
Orang/Paket |
|
[-] Konsultansi | |
0 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
0 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Jasa Konsultansi - Ketua |
Nilai pagu dana s.d. Rp. 50 Juta | |
0 |
0 |
0 |
|
Orang/Paket |
|
[#] Honorarium Tim Pendukung PPK | |
1.500.000 |
0 |
0 |
|
|
[-] Honorarium Tim Pendukung PPK | |
1.500.000 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
1.500.000 |
0 |
0 |
|
| 1 |
Tim Pendukung PPK 50 jt - 100 jt |
Penanggung Jawab | |
450.000 |
0 |
0 |
|
Orang/Paket |
| 2 |
Tim Pendukung PPK 50 jt - 100 jt |
Ketua | |
400.000 |
0 |
0 |
|
Orang/Paket |
| 3 |
Tim Pendukung PPK 50 jt - 100 jt |
Sekretaris | |
350.000 |
0 |
0 |
|
Orang/Paket |
| 4 |
Tim Pendukung PPK 50 jt - 100 jt |
Anggota | |
300.000 |
0 |
0 |
|
Orang/Paket |
|
[#] Jasa Konstruksi | |
150.000.000 |
0 |
0 |
|
|
[-] Pembangunan Pintu Air Ngurmo 5 Lokasi | |
150.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
150.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
150.000.000 |
0 |
0 |
|
Paket |
| |
Jumlah Pada Sub Kegiatan | |
297.711.100 |
0 |
0 |
|
|
1.03.02.2.02.0006 Pembangunan Sumur Jaringan Irigasi Air Tanah | |
2.594.857.475 |
0 |
0 |
|
|
[#] SPPD Dalam Daerah | |
2.500.000 |
0 |
0 |
|
|
[-] SPPD Dalam Daerah | |
2.500.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
2.500.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
2.500.000 |
0 |
0 |
|
Tahun |
|
[#] Belanja Alat Tulis Kantor | |
1.227.275 |
0 |
0 |
|
|
[-] Belanja Alat Tulis Kantor | |
1.227.275 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
1.227.275 |
0 |
0 |
|
| 1 |
BallPoint |
Biasa | |
16.000 |
0 |
0 |
|
Buah |
| 2 |
Correction Pen |
| |
35.000 |
0 |
0 |
|
Buah |
| 3 |
Ordner |
Folio | |
113.250 |
0 |
0 |
|
Buah |
| 4 |
Snelhecter Map |
Plastik | |
49.500 |
0 |
0 |
|
Buah |
| 5 |
Snelhecter Map |
Kertas | |
24.300 |
0 |
0 |
|
Buah |
| 6 |
Staples/Hechmachine |
HD 10, kecil | |
42.000 |
0 |
0 |
|
Buah |
| 7 |
Isi Stapples |
1210, Kecil | |
0 |
0 |
0 |
|
Dus |
| 8 |
Pembulatan/Penyesuaian |
| |
0 |
0 |
0 |
|
|
| 9 |
HVS 70 Gr |
F4 | |
219.300 |
0 |
0 |
|
Rim |
| 10 |
HVS 70 Gr |
A4 | |
130.000 |
0 |
0 |
|
Rim |
| 11 |
Kertas NCR |
Uk. A4, 3 Ply, 1000 Sheet | |
596.300 |
0 |
0 |
|
Box |
| 12 |
Pembulatan/Penyesuaian |
| |
1.625 |
0 |
0 |
|
Rupiah |
|
[#] Belanja Cetak | |
523.950 |
0 |
0 |
|
|
[-] Belanja Cetak | |
523.950 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
523.950 |
0 |
0 |
|
| 1 |
Photo Copy |
HVS A4/F4 70 gr | |
523.950 |
0 |
0 |
|
Lembar |
|
[#] Belanja Materai | |
118.500 |
0 |
0 |
|
|
[-] Belanja Materai | |
118.500 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Benda Pos | |
118.500 |
0 |
0 |
|
| 1 |
Materai |
Materai 10.000 | |
118.500 |
0 |
0 |
|
Buah |
|
[#] Belanja Bahan Komputer | |
607.750 |
0 |
0 |
|
|
[-] Belanja Bahan Komputer | |
607.750 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer | |
607.750 |
0 |
0 |
|
| 1 |
Tinta Printer |
Hitam, 200 Mili Liter | |
327.250 |
0 |
0 |
|
Buah |
| 2 |
Tinta Printer |
Warna, 200 Mili Liter | |
280.500 |
0 |
0 |
|
Buah |
|
[#] Pembangunan Sumur Air Tanah Dalam SDKMG Desa Tapen dan Desa Tambakmas, Beserta Peralatan dan Pemasangan Pompa | |
1.100.000.000 |
0 |
0 |
|
|
[-] Pekerjaan Konstruksi | |
1.100.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
1.100.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
1.100.000.000 |
0 |
0 |
|
Paket |
|
[#] Jasa Perencanaan (DED) Pembangunan Sumur Air Tanah Dalam SDKMG Desa Tapen dan Desa Tambakmas, Beserta Peralatan dan Pemasangan Pompa | |
52.000.000 |
0 |
0 |
|
|
[-] Jasa Perencanaan DED | |
52.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
52.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
52.000.000 |
0 |
0 |
|
Paket |
|
[#] Jasa Konsultansi Pengawasan Pembangunan Sumur Air Tanah Dalam SDKMG Desa Tapen dan Desa Tambakmas, Beserta Peralatan dan Pemasangan Pompa | |
38.000.000 |
0 |
0 |
|
|
[-] Jasa Konsultansi Pengawasan | |
38.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
38.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
38.000.000 |
0 |
0 |
|
Paket |
|
[#] Honorarium Pejabat Pengadaan | |
550.000 |
0 |
0 |
|
|
[-] Honorarium Pejabat Pengadaan Jasa Konsultansi | |
550.000 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
550.000 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Jasa Konsultansi - Ketua |
Nilai pagu dana s.d. Rp. 50 Juta | |
250.000 |
0 |
0 |
|
Orang/Paket |
| 2 |
Pejabat Pengadaan Jasa Konsultansi - Ketua |
Nilai pagu dana di atas Rp. 50 Juta s.d. Rp. 100 Juta | |
300.000 |
0 |
0 |
|
Orang/Paket |
|
[#] Belanja Mamin | |
1.466.000 |
0 |
0 |
|
|
[-] Belanja Mamin | |
1.466.000 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
1.466.000 |
0 |
0 |
|
| 1 |
Nasi Kotak |
Biasa | |
1.000.000 |
0 |
0 |
|
Box |
| 2 |
Snack Kotak |
Biasa | |
466.000 |
0 |
0 |
|
Box |
|
[#] Honor Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
3.100.000 |
0 |
0 |
|
|
[-] Honorarium Tim Pendukung | |
3.100.000 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
3.100.000 |
0 |
0 |
|
| 1 |
Tim Pendukung PPK 1 M - 2,5 M |
Penanggung Jawab | |
850.000 |
0 |
0 |
|
Orang/Paket |
| 2 |
Tim Pendukung PPK 1 M - 2,5 M |
Ketua | |
800.000 |
0 |
0 |
|
Orang/Paket |
| 3 |
Tim Pendukung PPK 1 M - 2,5 M |
Sekretaris | |
750.000 |
0 |
0 |
|
Orang/Paket |
| 4 |
Tim Pendukung PPK 1 M - 2,5 M |
Anggota | |
700.000 |
0 |
0 |
|
Orang/Paket |
|
[#] Publikasi | |
750.000 |
0 |
0 |
|
|
[-] Publikasi | |
750.000 |
0 |
0 |
|
|
Belanja Jasa Iklan/Reklame, Film, dan Pemotretan | |
750.000 |
0 |
0 |
|
| 1 |
Tarif Iklan - (Publikasi) |
4 Kolom X 200 Mm; Hitam Putih; 1 X Tayang; Koran Jurnal | |
750.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Lembur | |
6.714.000 |
0 |
0 |
|
|
[-] Belanja Lembur | |
6.714.000 |
0 |
0 |
|
|
Belanja Lembur | |
6.714.000 |
0 |
0 |
|
| 1 |
Uang Makan Lembur PNS |
Diberikan setelah bekerja lembur sekurang- kurangnya 2 Jam secara berturut-turut untuk semua golongan. | |
1.980.000 |
0 |
0 |
|
Orang |
| 2 |
Uang Lembur |
Golongan II | |
1.968.000 |
0 |
0 |
|
Orang / Jam |
| 3 |
Uang Lembur |
Golongan III | |
2.460.000 |
0 |
0 |
|
Orang / Jam |
| 4 |
Uang Lembur |
Golongan IV | |
288.000 |
0 |
0 |
|
Orang / Jam |
| 5 |
Uang Lembur |
Golongan I | |
18.000 |
0 |
0 |
|
Orang / Hari |
|
[#] Sewa Kendaraan | |
1.300.000 |
0 |
0 |
|
|
[-] Sewa Kendaraan | |
1.300.000 |
0 |
0 |
|
|
Belanja Sewa Kendaraan Bermotor Penumpang | |
1.300.000 |
0 |
0 |
|
| 1 |
Sewa Kendaraan Roda Empat |
Dalam Wilayah Kabupaten, Supir, BBM | |
1.300.000 |
0 |
0 |
|
Per Hari |
|
[#] SPPD Luar Daerah | |
1.000.000 |
0 |
0 |
|
|
[-] SPPD Luar Daerah | |
1.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Biasa | |
1.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Luar Daerah |
| |
1.000.000 |
0 |
0 |
|
Tahun |
|
[#] Pembangunan Sumur Air Tanah Dalam SDKMG Desa Tladan dan Desa Botok, Beserta Peralatan dan Pemasangan Pompa | |
1.300.000.000 |
0 |
0 |
|
|
[-] Pekerjaan Konstruksi | |
1.300.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
1.300.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
1.300.000.000 |
0 |
0 |
|
Paket |
|
[#] Jasa Konsultansi Perencanaan (DED) Pembangunan Sumur Air Tanah Dalam SDKMG Desa Tladan dan Desa Botok, Beserta Peralatan dan Pemasangan Pompa | |
50.000.000 |
0 |
0 |
|
|
[-] Jasa Perencanaan DED | |
50.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
50.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
50.000.000 |
0 |
0 |
|
Paket |
|
[#] Jasa Konsultansi Pengawasan Pembangunan Sumur Air Tanah Dalam SDKMG Desa Tladan dan Desa Botok, Beserta Peralatan dan Pemasangan Pompa | |
35.000.000 |
0 |
0 |
|
|
[-] Jasa Konsultansi Pengawasan | |
35.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
35.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
35.000.000 |
0 |
0 |
|
Paket |
| |
Jumlah Pada Sub Kegiatan | |
2.594.857.475 |
0 |
0 |
|
|
1.03.02.2.02.0008 Peningkatan Jaringan Irigasi Permukaan | |
966.037.375 |
0 |
0 |
|
|
[#] Perjalanan Dinas Dalam Daerah | |
4.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Dalam Daerah | |
4.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
4.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
4.000.000 |
0 |
0 |
|
Tahun |
|
[#] Belanja Alat Tulis Kantor | |
2.692.125 |
0 |
0 |
|
|
[-] Alat Tulis Kantor | |
2.692.125 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
2.692.125 |
0 |
0 |
|
| 1 |
Binder Clip |
No. 200 | |
32.250 |
0 |
0 |
|
Dus |
| 2 |
Ordner |
Folio | |
188.750 |
0 |
0 |
|
Buah |
| 3 |
Snelhecter Map |
Plastik | |
135.000 |
0 |
0 |
|
Buah |
| 4 |
Stop Map |
Kertas | |
221.450 |
0 |
0 |
|
Buah |
| 5 |
Isi Stapples |
1210, Kecil | |
52.700 |
0 |
0 |
|
Dus |
| 6 |
HVS 70 Gr |
F4 | |
219.300 |
0 |
0 |
|
Rim |
| 7 |
HVS 70 Gr |
A4 | |
650.000 |
0 |
0 |
|
Rim |
| 8 |
Kertas NCR |
Uk. A4, 3 Ply, 1000 Sheet | |
1.192.600 |
0 |
0 |
|
Box |
| 9 |
Pembulatan/Penyesuaian |
| |
75 |
0 |
0 |
|
Rupiah |
|
[#] Belanja Penggandaan | |
2.700.600 |
0 |
0 |
|
|
[-] Photo Copy | |
2.700.600 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
2.700.600 |
0 |
0 |
|
| 1 |
Photo Copy |
HVS A4/F4 70 gr | |
2.700.600 |
0 |
0 |
|
Lembar |
|
[#] Belanja Bahan Komputer | |
2.015.150 |
0 |
0 |
|
|
[-] Bahan Komputer | |
2.015.150 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer | |
2.015.150 |
0 |
0 |
|
| 1 |
Cartridge |
Cartridge Black | |
655.400 |
0 |
0 |
|
Buah |
| 2 |
Cartridge |
Cartridge Color | |
741.300 |
0 |
0 |
|
Buah |
| 3 |
Tinta Printer |
Ukuran 200 Ml (Hitam) | |
353.400 |
0 |
0 |
|
Buah |
| 4 |
Tinta Printer |
Ukuran 200 Ml (Warna) | |
265.050 |
0 |
0 |
|
Buah |
|
[#] Peningkatan Jaringan Irigasi Permukaan | |
850.000.000 |
0 |
0 |
|
|
[-] Peningkatan Jaringan Irigasi Gangging | |
100.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
100.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
100.000.000 |
0 |
0 |
|
Paket |
|
[-] Peningkatan Jaringan Irigasi Janggan (Lanjutan) | |
150.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
150.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
150.000.000 |
0 |
0 |
|
Paket |
|
[-] Peningkatan Jaringan Irigasi Ngampru | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Peningkatan Jaringan Irigasi Ngurmo (Lanjutan) | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Peningkatan Jaringan Irigasi Randubimo (Lanjutan) | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Konsultansi Perencanaan | |
52.000.000 |
0 |
0 |
|
|
[-] Perencanaan (DED) Peningkatan Jaringan Irigasi | |
52.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
52.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
52.000.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Konsultansi Pengawasan | |
32.000.000 |
0 |
0 |
|
|
[-] Pengawasan (Supervisi) Peningkatan Jaringan Irigasi | |
32.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
32.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
32.000.000 |
0 |
0 |
|
Paket |
|
[#] Honorarium Pejabat Pengadaan | |
0 |
0 |
0 |
|
|
[-] Honorarium Pejabat Pengadaan Konstruksi | |
0 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
0 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Pekerjaan Konstruksi/ Barang/ Jasa Lainnya - Ketua |
Nilai pagu dana di atas Rp. 50 Juta s.d. Rp. 100 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
| 2 |
Pejabat Pengadaan Pekerjaan Konstruksi/ Barang/ Jasa Lainnya - Ketua |
Nilai pagu dana di atas Rp. 100 Juta s.d. Rp. 200 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
|
[-] Honorarium Pejabat Pengadaan Konsultansi | |
0 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
0 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Jasa Konsultansi - Ketua |
Nilai pagu dana s.d. Rp. 50 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
| 2 |
Pejabat Pengadaan Jasa Konsultansi - Ketua |
Nilai pagu dana di atas Rp. 50 Juta s.d. Rp. 100 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
|
[#] Belanja Makanan dan Minuman Rapat | |
1.099.500 |
0 |
0 |
|
|
[-] Makanan dan Minuman Rapat | |
1.099.500 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
1.099.500 |
0 |
0 |
|
| 1 |
Nasi Kotak |
Biasa | |
750.000 |
0 |
0 |
|
Box |
| 2 |
Snack Kotak |
Biasa | |
349.500 |
0 |
0 |
|
Box |
|
[#] Honorarium Pelaksana Kegiatan | |
5.750.000 |
0 |
0 |
|
|
[-] Honorarium Tim Pendukung PPK 100 jt - 200 jt | |
5.750.000 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
5.750.000 |
0 |
0 |
|
| 1 |
Tim Pendukung PPK 100 jt - 200 jt |
Penanggung Jawab | |
1.375.000 |
0 |
0 |
|
Orang / Paket |
| 2 |
Tim Pendukung PPK 100 jt - 200 jt |
Ketua | |
1.250.000 |
0 |
0 |
|
Orang / Paket |
| 3 |
Tim Pendukung PPK 100 jt - 200 jt |
Sekretaris | |
1.125.000 |
0 |
0 |
|
Orang / Paket |
| 4 |
Tim Pendukung PPK 100 jt - 200 jt |
Anggota | |
2.000.000 |
0 |
0 |
|
Orang / Paket |
|
[#] Belanja Publikasi | |
3.750.000 |
0 |
0 |
|
|
[-] Belanja Publikasi | |
3.750.000 |
0 |
0 |
|
|
Belanja Jasa Iklan/Reklame, Film, dan Pemotretan | |
3.750.000 |
0 |
0 |
|
| 1 |
Tarif Iklan - (Publikasi) |
4 Kolom X 200 Mm; Hitam Putih; 1 X Tayang; Koran Jurnal | |
3.750.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Lembur | |
9.030.000 |
0 |
0 |
|
|
[-] Belanja Lembur | |
9.030.000 |
0 |
0 |
|
|
Belanja Lembur | |
9.030.000 |
0 |
0 |
|
| 1 |
Uang Makan Lembur PNS |
Diberikan setelah bekerja lembur sekurang- kurangnya 2 Jam secara berturut-turut untuk semua golongan. | |
1.530.000 |
0 |
0 |
|
Orang |
| 2 |
Uang Lembur |
Golongan II | |
1.320.000 |
0 |
0 |
|
Orang / Jam |
| 3 |
Uang Lembur |
Golongan III | |
5.100.000 |
0 |
0 |
|
Orang / Jam |
| 4 |
Uang Lembur |
Golongan IV | |
1.080.000 |
0 |
0 |
|
Orang / Jam |
|
[#] Belanja Sewa Kendaraan | |
0 |
0 |
0 |
|
|
[-] Sewa Kendaraan | |
0 |
0 |
0 |
|
|
Belanja Sewa Kendaraan Bermotor Penumpang | |
0 |
0 |
0 |
|
| 1 |
Sewa Kendaraan Roda Empat |
Keluar Wilayah Kabupaten, Supir, BBM | |
0 |
0 |
0 |
|
Hari |
|
[#] Perjalanan Dinas Luar Daerah | |
1.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Luar Daerah | |
1.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Biasa | |
1.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Luar Daerah |
| |
1.000.000 |
0 |
0 |
|
Tahun |
| |
Jumlah Pada Sub Kegiatan | |
966.037.375 |
0 |
0 |
|
|
1.03.02.2.02.0014 Rehabilitasi Jaringan Irigasi Permukaan | |
4.950.252.000 |
0 |
0 |
|
|
[#] Belanja Perjalanan Dinas Dalam Daerah | |
7.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Dalam Daerah | |
7.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
7.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
7.000.000 |
0 |
0 |
|
Tahun |
|
[#] Belanja Alat Tulis Kantor | |
7.091.200 |
0 |
0 |
|
|
[-] Alat Tulis Kantor | |
7.091.200 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
7.091.200 |
0 |
0 |
|
| 1 |
Ballpoint |
Isi ballpoint gel | |
400.000 |
0 |
0 |
|
Dus |
| 2 |
Pensil Biasa |
2B/HB | |
108.000 |
0 |
0 |
|
Buah |
| 3 |
Stabilo |
| |
113.000 |
0 |
0 |
|
Buah |
| 4 |
Ordner |
Folio | |
377.500 |
0 |
0 |
|
Buah |
| 5 |
Stop Map |
Kertas | |
430.000 |
0 |
0 |
|
Buah |
| 6 |
Pembulatan/Penyesuaian |
| |
200 |
0 |
0 |
|
Rupiah |
| 7 |
HVS 70 Gr |
F4 | |
731.000 |
0 |
0 |
|
Rim |
| 8 |
HVS 70 Gr |
A4 | |
1.950.000 |
0 |
0 |
|
Rim |
| 9 |
Kertas NCR |
Uk. A4, 3 Ply, 1000 Sheet | |
2.981.500 |
0 |
0 |
|
Box |
|
[#] Belanja Penggandaan | |
5.751.550 |
0 |
0 |
|
|
[-] Photo Copy | |
5.751.550 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
5.751.550 |
0 |
0 |
|
| 1 |
Photo Copy |
HVS A4/F4 70 gr | |
5.751.550 |
0 |
0 |
|
Lembar |
|
[#] Belanja Bahan Komputer | |
2.545.250 |
0 |
0 |
|
|
[-] Bahan Komputer | |
2.545.250 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer | |
2.545.250 |
0 |
0 |
|
| 1 |
Cartridge |
Cartridge Black | |
655.400 |
0 |
0 |
|
Buah |
| 2 |
Cartridge |
Cartridge Color | |
741.300 |
0 |
0 |
|
Buah |
| 3 |
Tinta Printer |
Ukuran 200 Ml (Hitam) | |
441.750 |
0 |
0 |
|
Buah |
| 4 |
Tinta Printer |
Ukuran 200 Ml (Warna) | |
706.800 |
0 |
0 |
|
Buah |
|
[#] Rehabilitasi Jaringan Irigasi Permukaan | |
4.340.100.000 |
0 |
0 |
|
|
[-] Rehabilitasi Jaringan Irigasi Dokare | |
180.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
180.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
180.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi Tunggu | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi Watusisik | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi Ngentep | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi Sindon | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi Krowe (Lanjutan) | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi Bondot | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi Bogo Kidul (Lanjutan) | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi Bogo Lor (Lanjutan) | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi DI. Bulungan | |
0 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
0 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
0 |
0 |
0 |
|
|
|
[-] Rehabilitasi Jaringan Irigasi DI Nitikan | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi DI Tonggoiro | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Penanganan Banjir Kali Sundu | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi DI Selotawing | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi DI Tlatak | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi DI Gandu | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi DI Molang 7 | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi DI Gembong | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi DI Koco | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Pengendalian Banjir Ngelang | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Jaringan Irigasi DI Sadon | |
560.100.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
560.100.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
560.100.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Konsultansi Perencanaan | |
299.000.000 |
0 |
0 |
|
|
[-] Desain Perencanaan dan e-PAKSI | |
0 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
0 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
0 |
0 |
0 |
|
|
|
[-] Perencanaan (DED) Rehabilitasi Jaringan Irigasi Permukaan Paket 1 | |
52.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
52.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
52.000.000 |
0 |
0 |
|
Paket |
|
[-] Perencanaan (DED) Rehabilitasi Jaringan Irigasi Permukaan Paket 2 | |
52.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
52.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
52.000.000 |
0 |
0 |
|
Paket |
|
[-] Perencanaan (DED) Rehabilitasi Jaringan Irigasi DI. Bulungan | |
72.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
72.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
72.000.000 |
0 |
0 |
|
Paket |
|
[-] Perencanaan (DED) Rehabilitasi Jaringan Irigasi Permukaan Paket 5 | |
23.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
23.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
23.000.000 |
0 |
0 |
|
Paket |
| 2 |
Jasa Konsultansi Perencanaan |
- | |
0 |
0 |
0 |
|
|
|
[-] Perencanaan (DED) Rehabilitasi Jaringan Irigasi Permukaan Paket 3 | |
50.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
50.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
50.000.000 |
0 |
0 |
|
Paket |
|
[-] Perencanaan (DED) Rehabilitasi Jaringan Irigasi Permukaan Paket 4 | |
50.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
50.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
50.000.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Konsultansi Pengawasan | |
158.000.000 |
0 |
0 |
|
|
[-] Pengawasan (Supervisi) Rehabilitasi Jaringan Irigasi Permukaan Paket 1 | |
36.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
36.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
36.000.000 |
0 |
0 |
|
Paket |
|
[-] Pengawasan (Supervisi) Rehabilitasi Jaringan Irigasi Permukaan Paket 2 | |
36.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
36.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
36.000.000 |
0 |
0 |
|
Paket |
|
[-] Pengawasan (Supervisi) Rehabilitasi Jaringan Irigasi DI. Bulungan | |
0 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
0 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
0 |
0 |
0 |
|
|
|
[-] Pengawasan (Supervisi) Rehabilitasi Jaringan Irigasi Permukaan Paket 5 | |
16.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
16.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
16.000.000 |
0 |
0 |
|
Paket |
|
[-] Pengawasan (Supervisi) Rehabilitasi Jaringan Irigasi Permukaan Paket 3 | |
35.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
35.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
35.000.000 |
0 |
0 |
|
Paket |
|
[-] Pengawasan (Supervisi) Rehabilitasi Jaringan Irigasi Permukaan Paket 4 | |
35.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
35.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
35.000.000 |
0 |
0 |
|
Paket |
|
[#] Honorarium Pejabat Pengadaan | |
0 |
0 |
0 |
|
|
[-] Honorarium Pejabat Pengadaan Konstruksi | |
0 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
0 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Pekerjaan Konstruksi/ Barang/ Jasa Lainnya - Ketua |
Nilai pagu dana di atas Rp. 100 Juta s.d. Rp. 200 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
|
[-] Honorarium Pejabat Pengadaan Konsultansi | |
0 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
0 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Jasa Konsultansi - Ketua |
Nilai pagu dana s.d. Rp. 50 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
| 2 |
Pejabat Pengadaan Jasa Konsultansi - Ketua |
Nilai pagu dana di atas Rp. 50 Juta s.d. Rp. 100 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
|
[#] Belanja Makanan dan Minuman Rapat | |
4.000.000 |
0 |
0 |
|
|
[-] Belanja Makanan dan Minuman Rapat | |
4.000.000 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
4.000.000 |
0 |
0 |
|
| 1 |
Nasi Kotak |
Biasa | |
4.000.000 |
0 |
0 |
|
Box |
|
[#] Belanja Makanan dan Minuman Rapat | |
1.864.000 |
0 |
0 |
|
|
[-] Belanja Makanan dan Minuman Rapat | |
1.864.000 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
1.864.000 |
0 |
0 |
|
| 1 |
Snack Kotak |
Biasa | |
1.864.000 |
0 |
0 |
|
Box |
|
[#] Honorarium Pelaksana Kegiatan | |
25.800.000 |
0 |
0 |
|
|
[-] Honorarium Tim Pendukung PPK 100 jt - 200 jt | |
24.150.000 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
24.150.000 |
0 |
0 |
|
| 1 |
Tim Pendukung PPK 100 jt - 200 jt |
Penanggung Jawab | |
5.775.000 |
0 |
0 |
|
Orang / Paket |
| 2 |
Tim Pendukung PPK 100 jt - 200 jt |
Ketua | |
5.250.000 |
0 |
0 |
|
Orang / Paket |
| 3 |
Tim Pendukung PPK 100 jt - 200 jt |
Sekretaris | |
4.725.000 |
0 |
0 |
|
Orang / Paket |
| 4 |
Tim Pendukung PPK 100 jt - 200 jt |
Anggota | |
8.400.000 |
0 |
0 |
|
Orang / Paket |
|
[-] Hoorarium Tim Pendukung PPK 1 M - 2,5 M | |
0 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
0 |
0 |
0 |
|
| 1 |
Tim Pendukung PPK 1 M - 2,5 M |
Penanggung Jawab | |
0 |
0 |
0 |
|
Orang / Paket |
| 2 |
Tim Pendukung PPK 1 M - 2,5 M |
Ketua | |
0 |
0 |
0 |
|
Orang / Paket |
| 3 |
Tim Pendukung PPK 1 M - 2,5 M |
Sekretaris | |
0 |
0 |
0 |
|
Orang / Paket |
| 4 |
Tim Pendukung PPK 1 M - 2,5 M |
Anggota | |
0 |
0 |
0 |
|
Orang / Paket |
|
[-] Honorarium Tim Pendukung PPK 500 jt - 1 M | |
1.650.000 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
1.650.000 |
0 |
0 |
|
| 1 |
Tim Pendukung PPK 500 jt - 1 M |
Penanggung Jawab | |
375.000 |
0 |
0 |
|
Orang / Paket |
| 2 |
Tim Pendukung PPK 500 jt - 1 M |
Ketua | |
350.000 |
0 |
0 |
|
Orang / Paket |
| 3 |
Tim Pendukung PPK 500 jt - 1 M |
Sekretaris | |
325.000 |
0 |
0 |
|
Orang / Paket |
| 4 |
Tim Pendukung PPK 500 jt - 1 M |
Anggota | |
600.000 |
0 |
0 |
|
Orang / Paket |
|
Belanja Modal Bangunan Pembawa Irigasi | |
0 |
0 |
0 |
|
| 1 |
Tim Pendukung PPK 500 jt - 1 M |
Penanggung Jawab | |
0 |
0 |
0 |
|
|
| 2 |
Tim Pendukung PPK 500 jt - 1 M |
Ketua | |
0 |
0 |
0 |
|
|
| 3 |
Tim Pendukung PPK 500 jt - 1 M |
Sekretaris | |
0 |
0 |
0 |
|
|
| 4 |
Tim Pendukung PPK 500 jt - 1 M |
Anggota | |
0 |
0 |
0 |
|
|
|
[#] Honorarium Penyuluhan dan Pendampingan | |
50.000.000 |
0 |
0 |
|
|
[-] Pendampingan Hukum | |
50.000.000 |
0 |
0 |
|
|
Honorarium Penyuluhan atau Pendampingan | |
50.000.000 |
0 |
0 |
|
| 1 |
Pendampingan Hukum |
- | |
50.000.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Publikasi | |
7.500.000 |
0 |
0 |
|
|
[-] Belanja Publikasi | |
7.500.000 |
0 |
0 |
|
|
Belanja Jasa Iklan/Reklame, Film, dan Pemotretan | |
7.500.000 |
0 |
0 |
|
| 1 |
Tarif Iklan - (Publikasi) |
4 Kolom X 200 Mm; Hitam Putih; 1 X Tayang; Koran Jurnal | |
7.500.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Lembur | |
19.300.000 |
0 |
0 |
|
|
[-] Belanja Lembur | |
19.300.000 |
0 |
0 |
|
|
Belanja Lembur | |
19.300.000 |
0 |
0 |
|
| 1 |
Uang Makan Lembur PNS |
Diberikan setelah bekerja lembur sekurang- kurangnya 2 Jam secara berturut-turut untuk semua golongan. | |
2.790.000 |
0 |
0 |
|
Orang |
| 2 |
Uang Makan Lembur Non PNS |
Diberikan setelah bekerja lembur sekurang- kurangnya 2 Jam secara berturut-turut untuk non PNS | |
660.000 |
0 |
0 |
|
Orang |
| 3 |
Uang Lembur |
Golongan II | |
2.520.000 |
0 |
0 |
|
Orang / Jam |
| 4 |
Uang Lembur |
Golongan III | |
8.250.000 |
0 |
0 |
|
Orang / Jam |
| 5 |
Uang Lembur |
Golongan IV | |
2.880.000 |
0 |
0 |
|
Orang / Jam |
| 6 |
Uang Lembur |
Non ASN | |
2.200.000 |
0 |
0 |
|
Orang / Jam |
|
[#] Belanja Sewa Kendaraan | |
9.300.000 |
0 |
0 |
|
|
[-] Sewa Kendaraan | |
9.300.000 |
0 |
0 |
|
|
Belanja Sewa Kendaraan Bermotor Penumpang | |
9.300.000 |
0 |
0 |
|
| 1 |
Sewa Kendaraan Roda Empat |
Dalam Wilayah Kabupaten, Supir, BBM | |
3.900.000 |
0 |
0 |
|
Hari |
| 2 |
Sewa Kendaraan Roda Empat |
Keluar Wilayah Kabupaten, Supir, BBM | |
5.400.000 |
0 |
0 |
|
Hari |
|
[#] Belanja Perjalanan Dinas Luar Daerah | |
13.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Luar Daerah | |
13.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Biasa | |
13.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Luar Daerah |
| |
13.000.000 |
0 |
0 |
|
Tahun |
| |
Jumlah Pada Sub Kegiatan | |
4.950.252.000 |
0 |
0 |
|
|
1.03.02.2.02.0015 Rehabilitasi Bendung Irigasi | |
1.185.238.525 |
0 |
0 |
|
|
[#] Belanja Perjalanan Dinas Dalam Daerah | |
3.500.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Dalam Daerah | |
3.500.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
3.500.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
3.500.000 |
0 |
0 |
|
Tahun |
|
[#] Belanja BBM | |
18.204.000 |
0 |
0 |
|
|
[-] Belanja BBM | |
18.204.000 |
0 |
0 |
|
|
Belanja Bahan-Bahan Bakar dan Pelumas | |
18.204.000 |
0 |
0 |
|
| 1 |
Pertamax |
| |
18.204.000 |
0 |
0 |
|
Liter |
|
[#] Belanja Alat Tulis Kantor | |
2.567.325 |
0 |
0 |
|
|
[-] Alat Tulis Kantor | |
2.567.325 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
2.567.325 |
0 |
0 |
|
| 1 |
BallPoint |
Pentel | |
644.700 |
0 |
0 |
|
Buah |
| 2 |
Binder Clip |
No. 111 | |
38.700 |
0 |
0 |
|
Dus |
| 3 |
Trigonal Klip |
Isi 10 Kotak | |
112.950 |
0 |
0 |
|
Box |
| 4 |
Snelhecter Map |
Kertas | |
78.300 |
0 |
0 |
|
Buah |
| 5 |
Stop Map |
Kertas | |
430.000 |
0 |
0 |
|
Buah |
| 6 |
Pembulatan/Penyesuaian |
| |
175 |
0 |
0 |
|
Rupiah |
| 7 |
HVS 70 Gr |
F4 | |
146.200 |
0 |
0 |
|
Rim |
| 8 |
HVS 70 Gr |
A4 | |
520.000 |
0 |
0 |
|
Rim |
| 9 |
Kertas NCR |
Uk. A4, 3 Ply, 1000 Sheet | |
596.300 |
0 |
0 |
|
Box |
|
[#] Belanja Penggandaan | |
3.449.250 |
0 |
0 |
|
|
[-] Photo Copy | |
3.449.250 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
3.449.250 |
0 |
0 |
|
| 1 |
Photo Copy |
HVS A4/F4 70 gr | |
3.449.250 |
0 |
0 |
|
Lembar |
|
[#] Belanja Bahan Komputer | |
1.228.450 |
0 |
0 |
|
|
[-] Bahan Komputer | |
1.228.450 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer | |
1.228.450 |
0 |
0 |
|
| 1 |
Cartridge |
Cartridge Black | |
327.700 |
0 |
0 |
|
Buah |
| 2 |
Cartridge |
Cartridge Color | |
370.650 |
0 |
0 |
|
Buah |
| 3 |
Tinta Printer |
Ukuran 200 Ml (Hitam) | |
265.050 |
0 |
0 |
|
Buah |
| 4 |
Tinta Printer |
Ukuran 200 Ml (Warna) | |
265.050 |
0 |
0 |
|
Buah |
|
[#] Rehabilitasi Bendung Irigasi | |
1.030.000.000 |
0 |
0 |
|
|
[-] Rehabilitasi Bendung dan Saluran Gangging 3 | |
100.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
100.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
100.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Bendung dan Saluran Selangsang 3 | |
150.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
150.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
150.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Bendung dan Saluran Genggong | |
180.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
180.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
180.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Bendung dan Saluran Getas 2 | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Bendung dan Saluran Sambirobyong | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Bendung dan Saluran Gonggang | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Konsultansi Perencanaan | |
64.000.000 |
0 |
0 |
|
|
[-] Perencanaan (DED) Rehabilitasi Bendung Irigasi | |
52.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
52.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
52.000.000 |
0 |
0 |
|
Paket |
|
[-] Perencanaan (DED) Rehabilitasi Bendung Irigasi Paket 1 | |
12.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
12.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
12.000.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Konsultansi Pengawasan | |
40.000.000 |
0 |
0 |
|
|
[-] Pengawasan (Supervisi) Rehabilitasi Bendung Irigasi | |
32.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
32.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
32.000.000 |
0 |
0 |
|
Paket |
|
[-] Pengawasan (Supervisi) Rehabilitasi Bendung Paket 1 | |
8.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pembawa Irigasi | |
8.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
8.000.000 |
0 |
0 |
|
Paket |
|
[#] Honorarium Pejabat Pengadaan | |
0 |
0 |
0 |
|
|
[-] Pejabat Pengadaan Konstruksi | |
0 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
0 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Pekerjaan Konstruksi/ Barang/ Jasa Lainnya - Ketua |
Nilai pagu dana di atas Rp. 50 Juta s.d. Rp. 100 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
| 2 |
Pejabat Pengadaan Pekerjaan Konstruksi/ Barang/ Jasa Lainnya - Ketua |
Nilai pagu dana di atas Rp. 100 Juta s.d. Rp. 200 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
|
[-] Honorarium Pejabat Pengadaan Konsultansi | |
0 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
0 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Jasa Konsultansi - Ketua |
Nilai pagu dana s.d. Rp. 50 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
| 2 |
Pejabat Pengadaan Jasa Konsultansi - Ketua |
Nilai pagu dana di atas Rp. 50 Juta s.d. Rp. 100 Juta | |
0 |
0 |
0 |
|
Orang / Paket |
|
[#] Belanja Makanan dan Minuman Rapat | |
1.099.500 |
0 |
0 |
|
|
[-] Makanan dan Minuman Rapat | |
1.099.500 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
1.099.500 |
0 |
0 |
|
| 1 |
Nasi Kotak |
Biasa | |
750.000 |
0 |
0 |
|
Box |
| 2 |
Snack Kotak |
Biasa | |
349.500 |
0 |
0 |
|
Box |
|
[#] Honorarium Pelaksana Kegiatan | |
6.900.000 |
0 |
0 |
|
|
[-] Honorarium Tim Pendukung PPK 100 jt - 200 jt | |
6.900.000 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
6.900.000 |
0 |
0 |
|
| 1 |
Tim Pendukung PPK 100 jt - 200 jt |
Penanggung Jawab | |
1.650.000 |
0 |
0 |
|
Orang / Paket |
| 2 |
Tim Pendukung PPK 100 jt - 200 jt |
Ketua | |
1.500.000 |
0 |
0 |
|
Orang / Paket |
| 3 |
Tim Pendukung PPK 100 jt - 200 jt |
Sekretaris | |
1.350.000 |
0 |
0 |
|
Orang / Paket |
| 4 |
Tim Pendukung PPK 100 jt - 200 jt |
Anggota | |
2.400.000 |
0 |
0 |
|
Orang / Paket |
|
[#] Belanja Publikasi | |
3.750.000 |
0 |
0 |
|
|
[-] Belanja Publikasi | |
3.750.000 |
0 |
0 |
|
|
Belanja Jasa Iklan/Reklame, Film, dan Pemotretan | |
3.750.000 |
0 |
0 |
|
| 1 |
Tarif Iklan - (Publikasi) |
4 Kolom X 200 Mm; Hitam Putih; 1 X Tayang; Koran Jurnal | |
3.750.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Lembur | |
9.540.000 |
0 |
0 |
|
|
[-] Belanja Lembur | |
9.540.000 |
0 |
0 |
|
|
Belanja Lembur | |
9.540.000 |
0 |
0 |
|
| 1 |
Uang Makan Lembur PNS |
Diberikan setelah bekerja lembur sekurang- kurangnya 2 Jam secara berturut-turut untuk semua golongan. | |
1.620.000 |
0 |
0 |
|
Orang |
| 2 |
Uang Lembur |
Golongan II | |
1.560.000 |
0 |
0 |
|
Orang / Jam |
| 3 |
Uang Lembur |
Golongan III | |
5.100.000 |
0 |
0 |
|
Orang / Jam |
| 4 |
Uang Lembur |
Golongan IV | |
1.260.000 |
0 |
0 |
|
Orang / Jam |
|
[#] Belanja Sewa Kendaraan | |
0 |
0 |
0 |
|
|
[-] Sewa Kendaraan | |
0 |
0 |
0 |
|
|
Belanja Sewa Kendaraan Bermotor Penumpang | |
0 |
0 |
0 |
|
| 1 |
Sewa Kendaraan Roda Empat |
Keluar Wilayah Kabupaten, Supir, BBM | |
0 |
0 |
0 |
|
Hari |
|
[#] Belanja Perjalanan Dinas Luar Daerah | |
1.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Luar Daerah | |
1.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Biasa | |
1.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Luar Daerah |
| |
1.000.000 |
0 |
0 |
|
Tahun |
| |
Jumlah Pada Sub Kegiatan | |
1.185.238.525 |
0 |
0 |
|
|
1.03.02.2.02.0018 Rehabilitasi Sumur Jaringan Irigasi Air Tanah | |
2.262.831.450 |
0 |
0 |
|
|
[#] Perjalanan Dinas Dalam Daerah | |
7.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Dalam Daerah | |
7.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
7.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
7.000.000 |
0 |
0 |
|
Tahun |
|
[#] Belanja Alat Tulis Kantor | |
2.355.250 |
0 |
0 |
|
|
[-] Belanja Alat Tulis Kantor | |
2.355.250 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
2.355.250 |
0 |
0 |
|
| 1 |
BallPoint |
Biasa | |
100.000 |
0 |
0 |
|
Buah |
| 2 |
Correction Pen |
| |
21.000 |
0 |
0 |
|
Buah |
| 3 |
Ordner |
Folio | |
75.500 |
0 |
0 |
|
Buah |
| 4 |
Snelhecter Map |
Plastik | |
72.000 |
0 |
0 |
|
Buah |
| 5 |
Snelhecter Map |
Kertas | |
159.300 |
0 |
0 |
|
Buah |
| 6 |
Staples/Hechmachine |
HD 10, kecil | |
105.000 |
0 |
0 |
|
Buah |
| 7 |
Isi Stapples |
1210, Kecil | |
237.150 |
0 |
0 |
|
Dus |
| 8 |
Pembulatan/Penyesuaian |
| |
100 |
0 |
0 |
|
Rupiah |
| 9 |
HVS 70 Gr |
F4 | |
0 |
0 |
0 |
|
Rim |
| 10 |
HVS 70 Gr |
A4 | |
390.000 |
0 |
0 |
|
Rim |
| 11 |
Kertas NCR |
Uk. A4, 3 Ply, 1000 Sheet | |
1.192.600 |
0 |
0 |
|
Box |
| 12 |
Pembulatan/Penyesuaian |
| |
2.600 |
0 |
0 |
|
Rupiah |
|
[#] Belanja Cetak | |
1.400.700 |
0 |
0 |
|
|
[-] Belanja Cetak | |
1.400.700 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
1.400.700 |
0 |
0 |
|
| 1 |
Photo Copy |
HVS A4/F4 70 gr | |
1.400.700 |
0 |
0 |
|
Lembar |
|
[#] Bahan Komputer | |
1.509.900 |
0 |
0 |
|
|
[-] Bahan Komputer | |
1.509.900 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer | |
1.509.900 |
0 |
0 |
|
| 1 |
Pita Printer |
L310 | |
481.400 |
0 |
0 |
|
Buah |
| 2 |
Tinta Printer |
Hitam, 200 Mili Liter | |
654.500 |
0 |
0 |
|
Buah |
| 3 |
Tinta Printer |
Warna, 200 Mili Liter | |
374.000 |
0 |
0 |
|
Buah |
|
[#] Rehabilitasi Sumur Jaringan Irigasi Air Tanah | |
2.000.000.000 |
0 |
0 |
|
|
[-] Rehabilitasi Sumur Air Tanah Dalam SDKMG 28 Ds. Purwosari (Purwosari & Sumur ESDM Ds.Bandar) | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Sumur Air Tanah Dalam SDKMG 29 Ds. Botok (2 Lokasi Ds. Botok dan SDKMG Uptd Taji Purwodadi) | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Sumur Air Tanah Dalam SDKMG 99 Ds. Kedungguwo ( 2 Lokasi SDKMG Kedungguwo dan Kejuron Kerep) | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Sumur Air Tanah Dalam SDMG Setren (2 Lokasi) | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Sumur Air Tanah Dalam SDKMG 61 Ds. Mategal (2 Lokasi Ds. Mategal & Ds. Kediren) | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Sumur Air Tanah Dalam SDKMG 73 Ds. Tamanan (2 Lokasi Ds. Tamanan & Ds. Carikan) | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Sumur Air Tanah Dalam SDKMG Krowe 2 Lokasi (D.I Bondot) | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Sumur Air Tanah Dalam SDKMG Pragak 2 Lokasi (D.I Tlatak) | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Sumur Air Tanah Dalam SDKMG Ds. Kentangan | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[-] Rehabilitasi Sumur Air Tanah Dalam SDKMG 21 UPTD Pengairan Gonggang | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Jasa Konsultansi Perencanaan | |
115.000.000 |
0 |
0 |
|
|
[-] Belanja Jasa Konsultansi Perencanaan Rehabilitasi Sumur Air Tanah Dalam SDKMG Pragak & Krowe Cs | |
19.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
19.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
19.000.000 |
0 |
0 |
|
Paket |
|
[-] Belanja Jasa Konsultasi Perencanaan Rehabilitasi Sumur Air Tanah dalam SDKMG 61 Ds. Mategal Cs | |
35.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
35.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
35.000.000 |
0 |
0 |
|
Paket |
|
[-] Belanja Jasa Konsultansi Perencanaan Rehabilitasi Sumur Air Tanah Dalam SDKMG 28 Ds. Purwosari Cs | |
45.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
45.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
45.000.000 |
0 |
0 |
|
Paket |
|
[-] Belanja Jasa Konsultansi Rehabilitasi Sumur Air Tanah Dalam SDKMG Ds Kentangan & SDKMG 21 UPTD Pengairan Gonggang | |
16.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
16.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
16.000.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Jasa Konsultansi Pengawasan | |
88.000.000 |
0 |
0 |
|
|
[-] Belanja Jasa Konsultansi Pengawasan Rehabilitasi Sumur Air Tanah Dalam SDKMG Pragak & Krowe Cs | |
14.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
14.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
14.000.000 |
0 |
0 |
|
Paket |
|
[-] Belanja Jasa Konsultasi Pengawasan Rehabilitasi Sumur Air Tanah dalam SDKMG 61 Ds. Mategal Cs | |
25.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
25.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
25.000.000 |
0 |
0 |
|
Paket |
|
[-] Belanja Jasa Konsultansi Pengawasan Rehabilitasi Sumur Air Tanah Dalam SDKMG 28 Ds. Purwosari Cs | |
35.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
35.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
35.000.000 |
0 |
0 |
|
Paket |
|
[-] Belanja Jasa Konsultansi Rehabilitasi Sumur Air Tanah Dalam SDKMG Ds Kentangan & SDKMG 21 UPTD Pengairan Gonggang | |
14.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
14.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Pengawasan |
- | |
14.000.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Honorarium Pengadaan Barang/Jasa | |
3.900.000 |
0 |
0 |
|
|
[-] Pejabat Pengadaan Pekerjaan Kontruksi | |
2.400.000 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
2.400.000 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Pekerjaan Konstruksi/ Barang/ Jasa Lainnya - Ketua |
Nilai pagu dana di atas Rp. 100 Juta s.d. Rp. 200 Juta | |
2.400.000 |
0 |
0 |
|
Orang / Paket |
|
[-] Pejabat Pengadaan Pekerjaan Konsultansi | |
1.500.000 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
1.500.000 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Jasa Konsultansi - Ketua |
Nilai pagu dana s.d. Rp. 50 Juta | |
1.500.000 |
0 |
0 |
|
Orang / Paket |
|
[#] Belanja Makanan dan Minuman Rapat | |
2.345.600 |
0 |
0 |
|
|
[-] Belanja Mamin | |
2.345.600 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
2.345.600 |
0 |
0 |
|
| 1 |
Nasi Kotak |
Biasa | |
1.600.000 |
0 |
0 |
|
Box |
| 2 |
Snack Kotak |
Biasa | |
745.600 |
0 |
0 |
|
Box |
|
[#] Honor Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
8.550.000 |
0 |
0 |
|
|
[-] Honorarium Tim Pendukung | |
8.550.000 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
8.550.000 |
0 |
0 |
|
| 1 |
Tim Pendukung PPK 100 jt - 200 jt |
Penanggung Jawab | |
2.475.000 |
0 |
0 |
|
Orang / Paket |
| 2 |
Tim Pendukung PPK 100 jt - 200 jt |
Ketua | |
2.250.000 |
0 |
0 |
|
Orang / Paket |
| 3 |
Tim Pendukung PPK 100 jt - 200 jt |
Sekretaris | |
2.025.000 |
0 |
0 |
|
Orang / Paket |
| 4 |
Tim Pendukung PPK 100 jt - 200 jt |
Anggota | |
1.800.000 |
0 |
0 |
|
Orang / Paket |
|
[#] Belanja Jasa Iklan/Reklame, Film dan Pemotretan | |
2.250.000 |
0 |
0 |
|
|
[-] Publikasi | |
2.250.000 |
0 |
0 |
|
|
Belanja Jasa Iklan/Reklame, Film, dan Pemotretan | |
2.250.000 |
0 |
0 |
|
| 1 |
Tarif Iklan - (Publikasi) |
4 Kolom X 200 Mm; Hitam Putih; 1 X Tayang; Koran Jurnal | |
2.250.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Lembur | |
18.420.000 |
0 |
0 |
|
|
[-] Belanja Uang Makan Lembur | |
3.300.000 |
0 |
0 |
|
|
Belanja Lembur | |
3.300.000 |
0 |
0 |
|
| 1 |
Uang Makan Lembur PNS |
Diberikan setelah bekerja lembur sekurang- kurangnya 2 Jam secara berturut-turut untuk semua golongan. | |
3.300.000 |
0 |
0 |
|
Orang |
|
[-] Belanja Lembur Golongan II | |
4.800.000 |
0 |
0 |
|
|
Belanja Lembur | |
4.800.000 |
0 |
0 |
|
| 1 |
Uang Lembur |
Golongan II | |
4.800.000 |
0 |
0 |
|
Orang / Jam |
|
[-] Belanja Lembur Golongan III | |
9.060.000 |
0 |
0 |
|
|
Belanja Lembur | |
9.060.000 |
0 |
0 |
|
| 1 |
Uang Lembur |
Golongan III | |
9.060.000 |
0 |
0 |
|
Orang / Jam |
|
[-] Belanja Lembur Golongan IV | |
1.260.000 |
0 |
0 |
|
|
Belanja Lembur | |
1.260.000 |
0 |
0 |
|
| 1 |
Uang Lembur |
Golongan IV | |
1.260.000 |
0 |
0 |
|
Orang / Jam |
|
[#] Sewa Kendaraan Roda Empat | |
8.100.000 |
0 |
0 |
|
|
[-] Sewa Kendaraan Roda Empat | |
8.100.000 |
0 |
0 |
|
|
Belanja Sewa Kendaraan Bermotor Penumpang | |
8.100.000 |
0 |
0 |
|
| 1 |
Sewa Kendaraan Roda Empat |
Keluar Wilayah Kabupaten, Supir, BBM | |
8.100.000 |
0 |
0 |
|
Unit |
|
[#] Perjalanan Dinas Luar Daerah | |
4.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Luar Daerah | |
4.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Biasa | |
4.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Luar Daerah |
| |
4.000.000 |
0 |
0 |
|
Tahun |
| |
Jumlah Pada Sub Kegiatan | |
2.262.831.450 |
0 |
0 |
|
|
1.03.02.2.02.0021 Operasi dan Pemeliharaan Jaringan Irigasi Permukaan | |
632.766.581 |
0 |
0 |
|
|
[#] Perjalanan Dinas Dalam Daerah | |
8.500.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Dalam Daerah | |
8.500.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
8.500.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
8.500.000 |
0 |
0 |
|
Tahun |
|
[#] Belanja BMM Kendaraan Dinas Operasional | |
222.334.000 |
0 |
0 |
|
|
[-] Belanja BBM Kendaraan Dinas Operasional | |
217.610.000 |
0 |
0 |
|
|
Belanja Bahan-Bahan Bakar dan Pelumas | |
217.610.000 |
0 |
0 |
|
| 1 |
Pertamax |
| |
38.110.000 |
0 |
0 |
|
Liter |
| 2 |
Pertamina Dex |
| |
179.500.000 |
0 |
0 |
|
Liter |
|
[-] Oli Mesin | |
2.682.000 |
0 |
0 |
|
|
Belanja Bahan-Bahan Bakar dan Pelumas | |
2.682.000 |
0 |
0 |
|
| 1 |
Oli Mesin |
1 Liter | |
2.682.000 |
0 |
0 |
|
Liter |
|
[-] Minyak Pelumas | |
2.042.000 |
0 |
0 |
|
|
Belanja Bahan-Bahan Bakar dan Pelumas | |
2.042.000 |
0 |
0 |
|
| 1 |
Minyak Pelumas |
| |
2.042.000 |
0 |
0 |
|
Liter |
|
[#] Belanja Alat Tulis Kantor | |
3.575.331 |
0 |
0 |
|
|
[-] Belanja Alat Tulis Kantor | |
3.575.331 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
3.575.331 |
0 |
0 |
|
| 1 |
BallPoint |
Biasa | |
84.000 |
0 |
0 |
|
Buah |
| 2 |
Correction Pen |
| |
63.000 |
0 |
0 |
|
Buah |
| 3 |
Ordner |
Folio | |
377.500 |
0 |
0 |
|
Buah |
| 4 |
Snelhecter Map |
Plastik | |
414.000 |
0 |
0 |
|
Buah |
| 5 |
Snelhecter Map |
Kertas | |
137.700 |
0 |
0 |
|
Buah |
| 6 |
Staples/Hechmachine |
HD 10, kecil | |
126.000 |
0 |
0 |
|
Buah |
| 7 |
Isi Stapples |
1210, Kecil | |
184.450 |
0 |
0 |
|
Dus |
| 8 |
Pembulatan/Penyesuaian |
| |
181 |
0 |
0 |
|
Rupiah |
| 9 |
HVS 70 Gr |
F4 | |
877.200 |
0 |
0 |
|
Rim |
| 10 |
HVS 70 Gr |
A4 | |
715.000 |
0 |
0 |
|
Rim |
| 11 |
Kertas NCR |
Uk. A4, 3 Ply, 1000 Sheet | |
596.300 |
0 |
0 |
|
Box |
|
[#] Belanja Cetak | |
2.101.750 |
0 |
0 |
|
|
[-] Belanja Cetak | |
2.101.750 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
2.101.750 |
0 |
0 |
|
| 1 |
Photo Copy |
HVS A4/F4 70 gr | |
2.101.750 |
0 |
0 |
|
Lembar |
|
[#] Belanja Benda Pos | |
592.500 |
0 |
0 |
|
|
[-] Belanja Materai | |
592.500 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Benda Pos | |
592.500 |
0 |
0 |
|
| 1 |
Materai |
Materai 10.000 | |
592.500 |
0 |
0 |
|
Buah |
|
[#] Belanja Bahan Komputer | |
2.606.000 |
0 |
0 |
|
|
[-] Belanja Bahan Komputer | |
2.606.000 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer | |
2.606.000 |
0 |
0 |
|
| 1 |
Pita Printer |
L310 | |
1.203.500 |
0 |
0 |
|
Buah |
| 2 |
Tinta Printer |
Hitam, 200 Mili Liter | |
467.500 |
0 |
0 |
|
Buah |
| 3 |
Tinta Printer |
Warna, 200 Mili Liter | |
935.000 |
0 |
0 |
|
Buah |
|
[#] Belanja Bahan Bangunan Penanganan Darurat Sumber Daya Air | |
200.000.000 |
0 |
0 |
|
|
[-] Belanja Bahan Bangunan | |
200.000.000 |
0 |
0 |
|
|
Belanja Modal Bangunan Pengambilan Irigasi | |
200.000.000 |
0 |
0 |
|
| 1 |
Pekerjaan Konstruksi |
| |
200.000.000 |
0 |
0 |
|
Paket |
|
[#] Honor Pejabat Pengadaan | |
300.000 |
0 |
0 |
|
|
[-] Honorarium Pejabat Pengadaan | |
300.000 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
300.000 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Pekerjaan Konstruksi/ Barang/ Jasa Lainnya - Ketua |
Nilai pagu dana di atas Rp. 100 Juta s.d. Rp. 200 Juta | |
300.000 |
0 |
0 |
|
Orang/Paket |
|
[#] Belanja Mamin | |
11.728.000 |
0 |
0 |
|
|
[-] Belanja Mamin | |
11.728.000 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
11.728.000 |
0 |
0 |
|
| 1 |
Nasi Kotak |
Biasa | |
8.000.000 |
0 |
0 |
|
Box |
| 2 |
Snack Kotak |
Biasa | |
3.728.000 |
0 |
0 |
|
Box |
|
[#] Honorarium Tenaga Penanganan Prasarana & Sarana Umum | |
100.121.000 |
0 |
0 |
|
|
[-] Tukang Batu | |
11.433.000 |
0 |
0 |
|
|
Belanja Jasa Tenaga Penanganan Prasarana dan Sarana Umum | |
11.433.000 |
0 |
0 |
|
| 1 |
Tukang Batu |
- | |
11.433.000 |
0 |
0 |
|
Orang / Hari |
|
[-] Pekerja | |
33.480.000 |
0 |
0 |
|
|
Belanja Jasa Tenaga Penanganan Prasarana dan Sarana Umum | |
33.480.000 |
0 |
0 |
|
| 1 |
Pekerja |
- | |
33.480.000 |
0 |
0 |
|
Orang / Hari |
|
[-] Operator Alat Berat | |
55.208.000 |
0 |
0 |
|
|
Belanja Jasa Tenaga Penanganan Prasarana dan Sarana Umum | |
55.208.000 |
0 |
0 |
|
| 1 |
Operator Alat Berat |
- | |
55.208.000 |
0 |
0 |
|
Orang / Hari |
|
[#] Belanja Publikasi | |
2.250.000 |
0 |
0 |
|
|
[-] Belanja Publikasi | |
2.250.000 |
0 |
0 |
|
|
Belanja Jasa Iklan/Reklame, Film, dan Pemotretan | |
2.250.000 |
0 |
0 |
|
| 1 |
Tarif Iklan - (Publikasi) |
4 Kolom X 200 Mm; Hitam Putih; 1 X Tayang; Koran Jurnal | |
2.250.000 |
0 |
0 |
|
Paket |
|
[#] Belanja Lembur | |
31.558.000 |
0 |
0 |
|
|
[-] Belanja Lembur | |
31.558.000 |
0 |
0 |
|
|
Belanja Lembur | |
31.558.000 |
0 |
0 |
|
| 1 |
Uang Makan Lembur PNS |
Diberikan setelah bekerja lembur sekurang- kurangnya 2 Jam secara berturut-turut untuk semua golongan. | |
5.580.000 |
0 |
0 |
|
Orang |
| 2 |
Uang Makan Lembur Non PNS |
Diberikan setelah bekerja lembur sekurang- kurangnya 2 Jam secara berturut-turut untuk non PNS | |
1.050.000 |
0 |
0 |
|
Orang |
| 3 |
Uang Lembur |
Golongan II | |
8.712.000 |
0 |
0 |
|
Orang / Jam |
| 4 |
Uang Lembur |
Golongan III | |
10.500.000 |
0 |
0 |
|
Orang / Jam |
| 5 |
Uang Lembur |
Golongan IV | |
2.916.000 |
0 |
0 |
|
Orang / Jam |
| 6 |
Uang Lembur |
Non ASN | |
2.800.000 |
0 |
0 |
|
Orang / Jam |
|
[#] Sewa kendaraan Roda 4 | |
8.100.000 |
0 |
0 |
|
|
[-] Sewa Kendaraan Roda 4 | |
8.100.000 |
0 |
0 |
|
|
Belanja Sewa Kendaraan Bermotor Penumpang | |
8.100.000 |
0 |
0 |
|
| 1 |
Sewa Kendaraan Roda Empat |
Keluar Wilayah Kabupaten, Supir, BBM | |
8.100.000 |
0 |
0 |
|
Unit |
|
[#] Sewa Kendaraan Dump Truck | |
14.000.000 |
0 |
0 |
|
|
[-] Sewa Kendaraan Dump Truck | |
14.000.000 |
0 |
0 |
|
|
Belanja Sewa Kendaraan Bermotor Angkutan Barang | |
14.000.000 |
0 |
0 |
|
| 1 |
Sewa Dump Truck |
- | |
14.000.000 |
0 |
0 |
|
Unit |
|
[#] Pemeliharaan Excavator | |
15.000.000 |
0 |
0 |
|
|
[-] Pemeliharaan Excavator | |
15.000.000 |
0 |
0 |
|
|
Belanja Pemeliharaan Alat Angkutan-Alat Angkutan Darat Bermotor-Kendaraan Bermotor Angkutan Barang | |
15.000.000 |
0 |
0 |
|
| 1 |
Kendaraan Roda 6; Truck |
- | |
15.000.000 |
0 |
0 |
|
Unit / Tahun |
|
[#] Pemeliharaan Kendaraan Roda 4 Operasional Lapangan | |
5.000.000 |
0 |
0 |
|
|
[-] Pemeliharaan Kendaraan Roda 4 | |
5.000.000 |
0 |
0 |
|
|
Belanja Pemeliharaan Alat Angkutan-Alat Angkutan Darat Bermotor-Kendaraan Bermotor Penumpang | |
5.000.000 |
0 |
0 |
|
| 1 |
Kendaraan Roda 4 (Operasional lapangan) |
- | |
5.000.000 |
0 |
0 |
|
Unit / Tahun |
|
[#] Perjalanan Dinas Luar Daerah | |
5.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Luar Daerah | |
5.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Biasa | |
5.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Luar Daerah |
| |
5.000.000 |
0 |
0 |
|
Tahun |
| |
Jumlah Pada Sub Kegiatan | |
632.766.581 |
0 |
0 |
|
|
1.03.02.2.02.0035 Penyusunan Rencana Teknis dan Dokumen Lingkungan Hidup untuk Konstruksi Irigasi dan Rawa | |
118.099.350 |
0 |
0 |
|
|
[#] Perjalanan Dinas | |
4.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Dalam Kota | |
2.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
2.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
2.000.000 |
0 |
0 |
|
Tahun |
|
[-] Perjalanan dinas Luar kota | |
2.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Biasa | |
2.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Luar Daerah |
| |
2.000.000 |
0 |
0 |
|
Tahun |
|
[#] Belanja Alat Tulis Kantor | |
3.749.000 |
0 |
0 |
|
|
[-] Belanja Alat Tulis Kantor | |
3.749.000 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
3.749.000 |
0 |
0 |
|
| 1 |
BallPoint |
Biasa | |
400.000 |
0 |
0 |
|
Buah |
| 2 |
Ordner |
Folio | |
415.250 |
0 |
0 |
|
Buah |
| 3 |
Snelhecter Map |
Plastik | |
463.500 |
0 |
0 |
|
Buah |
| 4 |
Stop Map |
Kertas | |
367.650 |
0 |
0 |
|
Buah |
| 5 |
HVS 70 Gr |
A4 | |
910.000 |
0 |
0 |
|
Rim |
| 6 |
Kertas NCR |
Uk. A4, 3 Ply, 1000 Sheet | |
1.192.600 |
0 |
0 |
|
Box |
|
[#] Belanja Cetak (Photo Copy) | |
2.007.600 |
0 |
0 |
|
|
[-] Belanja Photo Copy | |
2.007.600 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
2.007.600 |
0 |
0 |
|
| 1 |
Photo Copy |
HVS, F4 70 gr | |
2.007.600 |
0 |
0 |
|
Lembar |
|
[#] Belanja Bahan Komputer | |
6.992.750 |
0 |
0 |
|
|
[-] Belanja Bahan Komputer | |
6.992.750 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer | |
6.992.750 |
0 |
0 |
|
| 1 |
Cartridge |
Cartridge Black | |
2.621.600 |
0 |
0 |
|
Buah |
| 2 |
Cartridge |
Cartridge Color | |
2.965.200 |
0 |
0 |
|
Buah |
| 3 |
Tinta Printer |
Ukuran 100 Ml (Warna) | |
522.450 |
0 |
0 |
|
Buah |
| 4 |
Tinta Printer |
Ukuran 200 Ml (Hitam) | |
883.500 |
0 |
0 |
|
Buah |
|
[#] Honorarium pengadaan Barang dan jasa | |
0 |
0 |
0 |
|
|
[-] Belanja Pengadaan Barang dan Jasa | |
0 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
0 |
0 |
0 |
|
| 1 |
Ketua |
Nilai pagu dana di atas Rp. 50 Juta s.d. 100 Juta | |
0 |
0 |
0 |
|
Orang/Paket |
|
[#] Belanja Lembur | |
19.800.000 |
0 |
0 |
|
|
[-] Belanja Lembur | |
19.800.000 |
0 |
0 |
|
|
Belanja Lembur | |
19.800.000 |
0 |
0 |
|
| 1 |
Uang Makan Lembur PNS |
Diberikan setelah bekerja lembur sekurang- kurangnya 2 Jam secara berturut-turut untuk semua golongan. | |
2.940.000 |
0 |
0 |
|
Orang / Hari |
| 2 |
Uang Makan Lembur Non PNS |
Diberikan setelah bekerja lembur sekurang- kurangnya 2 Jam secara berturut-turut untuk non PNS | |
450.000 |
0 |
0 |
|
Orang / Hari |
| 3 |
Uang Lembur |
Golongan II | |
840.000 |
0 |
0 |
|
Orang / Jam |
| 4 |
Uang Lembur |
Golongan III | |
11.550.000 |
0 |
0 |
|
Orang / Jam |
| 5 |
Uang Lembur |
Golongan IV | |
2.520.000 |
0 |
0 |
|
Orang / Jam |
| 6 |
Uang Lembur |
Non ASN | |
1.500.000 |
0 |
0 |
|
Orang / Jam |
|
[#] Belanja Sewa | |
1.550.000 |
0 |
0 |
|
|
[-] Sewa Dalam Kota | |
650.000 |
0 |
0 |
|
|
Belanja Sewa Kendaraan Bermotor Penumpang | |
650.000 |
0 |
0 |
|
| 1 |
Sewa Kendaraan Roda Empat |
Dalam Wilayah Kabupaten, Supir, BBM | |
650.000 |
0 |
0 |
|
Unit |
|
[-] Sewa Luar Kota | |
900.000 |
0 |
0 |
|
|
Belanja Sewa Kendaraan Bermotor Penumpang | |
900.000 |
0 |
0 |
|
| 1 |
Sewa Kendaraan Roda Empat |
Keluar Wilayah Kabupaten, Supir, BBM | |
900.000 |
0 |
0 |
|
Unit |
|
[#] Belanja Jasa Konsultansi | |
80.000.000 |
0 |
0 |
|
|
[-] Penyusunan Data Pendukung Usulan DAK Irigasi | |
80.000.000 |
0 |
0 |
|
|
Belanja Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air | |
80.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Perencanaan |
- | |
80.000.000 |
0 |
0 |
|
Paket |
| |
Jumlah Pada Sub Kegiatan | |
118.099.350 |
0 |
0 |
|
| |
Jumlah Pada SKPD | |
16.107.248.506 |
0 |
0 |
|
|
2.11.2.09.0.00.01.0000 DINAS LINGKUNGAN HIDUP DAN PANGAN | |
531.964.100 |
0 |
0 |
|
|
2.09.04.2.02.0002 Pelaksanaan Pengadaan, Pengelolaan, dan Penyaluran Cadangan Pangan pada Kerawanan Pangan yang Mencakup dalam 1 (satu) Daerah Kabupaten/Kota | |
531.964.100 |
0 |
0 |
Pengadaan, Pengelolaan, dan Penyaluran Cadangan Pangan pada Kerawanan Pangan |
|
[#] Perjalanan Dinas Dalam Daerah | |
1.000.000 |
0 |
0 |
|
|
[-] - | |
1.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
1.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
1.000.000 |
0 |
0 |
|
Tahun |
|
[#] Karung Plastik | |
5.845.000 |
0 |
0 |
|
|
[-] - | |
5.845.000 |
0 |
0 |
|
|
Belanja Bahan-Bahan Bangunan dan Konstruksi | |
5.845.000 |
0 |
0 |
|
| 1 |
Karung Plastik |
Polos, Kapasitas 50 Kg, Ukuran 60 x 100 cm, Tebal 10 x 10/ 650 | |
5.845.000 |
0 |
0 |
|
Lembar |
|
[#] Belanja Obat-Obatan Lainnya | |
477.000 |
0 |
0 |
|
|
[-] - | |
477.000 |
0 |
0 |
|
|
Belanja Obat-Obatan-Obat-Obatan Lainnya | |
477.000 |
0 |
0 |
|
| 1 |
Herbisida Roundup |
Sistemik | |
477.000 |
0 |
0 |
|
Botol |
|
[#] Cetak Banner | |
0 |
0 |
0 |
|
|
[-] - | |
0 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
0 |
0 |
0 |
|
| 1 |
Cetak Backdrop/Banner |
Bahan Vinyl 320 gr | |
0 |
0 |
0 |
|
M2 |
|
[#] Cetak kemasan beras | |
5.000.000 |
0 |
0 |
|
|
[-] - | |
5.000.000 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
5.000.000 |
0 |
0 |
|
| 1 |
Cetak Kemasan Benih |
Plastik Ukuran 50 Cm X 30 Cm | |
5.000.000 |
0 |
0 |
|
Lembar |
|
[#] Penggandaan | |
358.950 |
0 |
0 |
|
|
[-] - | |
358.950 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
358.950 |
0 |
0 |
|
| 1 |
Penjilidan |
Soft Cover | |
52.000 |
0 |
0 |
|
Buku |
| 2 |
Photo Copy |
HVS, F4 70 gr | |
306.950 |
0 |
0 |
|
Lembar |
|
[#] Pembulatan | |
0 |
0 |
0 |
|
|
[-] - | |
0 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
0 |
0 |
0 |
|
| 1 |
Pembulatan/Penyesuaian |
| |
0 |
0 |
0 |
|
Rupiah |
|
[#] Belanja Alat Tulis Kantor | |
1.402.750 |
0 |
0 |
|
|
[-] - | |
1.402.750 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Kertas dan Cover | |
1.402.750 |
0 |
0 |
|
| 1 |
HVS 70 Gr |
F4 | |
731.000 |
0 |
0 |
|
Rim |
| 2 |
Kertas Ncr Bottom |
Ukuran F4 | |
322.500 |
0 |
0 |
|
Rim |
| 3 |
Kertas Ncr Top |
Ukuran F4 | |
349.250 |
0 |
0 |
|
Rim |
|
[#] Belanja Gabah CPP | |
296.244.000 |
0 |
0 |
|
|
[-] - | |
296.244.000 |
0 |
0 |
|
|
Belanja Natura dan Pakan-Natura | |
296.244.000 |
0 |
0 |
|
| 1 |
Gabah |
Kering Giling | |
296.244.000 |
0 |
0 |
|
Kg |
|
[#] Rehabilitasi Gudang CPP | |
180.000.000 |
0 |
0 |
|
|
[-] - | |
180.000.000 |
0 |
0 |
|
|
Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor | |
180.000.000 |
0 |
0 |
|
| 1 |
Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor |
| |
180.000.000 |
0 |
0 |
|
Paket |
|
[#] Jasa Perencanaan Rehabilitasi Gudang CPP | |
9.000.000 |
0 |
0 |
|
|
[-] - | |
9.000.000 |
0 |
0 |
|
|
Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor | |
9.000.000 |
0 |
0 |
|
| 1 |
Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor |
| |
9.000.000 |
0 |
0 |
|
Paket |
|
[#] Jasa Pengawasan Rehab Gudang CPP | |
7.000.000 |
0 |
0 |
|
|
[-] - | |
7.000.000 |
0 |
0 |
|
|
Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor | |
7.000.000 |
0 |
0 |
|
| 1 |
Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor |
| |
7.000.000 |
0 |
0 |
|
Paket |
|
[#] Pejabat Pengadaan Barang/Jasa | |
800.000 |
0 |
0 |
|
|
[-] Honor Pejabat Pengadaan Barang/jasa - Konstruksi | |
800.000 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
800.000 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Pekerjaan Konstruksi/ Barang/ Jasa Lainnya - Ketua |
Nilai pagu dana di atas Rp. 100 Juta s.d. Rp. 200 Juta | |
300.000 |
0 |
0 |
|
Orang / Paket |
| 2 |
Pejabat Pengadaan Jasa Konsultansi - Ketua |
Nilai pagu dana s.d. Rp. 50 Juta | |
500.000 |
0 |
0 |
|
Orang / Paket |
|
[#] Konsumsi Rapat | |
586.400 |
0 |
0 |
|
|
[-] - | |
586.400 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
586.400 |
0 |
0 |
|
| 1 |
Nasi Kotak |
Biasa | |
400.000 |
0 |
0 |
|
Box |
| 2 |
Snack Kotak |
Biasa | |
186.400 |
0 |
0 |
|
Box |
|
[#] Tenaga Kerja Harian | |
21.250.000 |
0 |
0 |
|
|
[-] - | |
21.250.000 |
0 |
0 |
|
|
Belanja Jasa Tenaga Teknis Pertanian dan Pangan | |
21.250.000 |
0 |
0 |
|
| 1 |
Tenaga kerja bidang pertanian/perkebunan |
Tenaga Terampil | |
21.250.000 |
0 |
0 |
|
Orang / Hari |
|
[#] Perjalanan Dinas Luar Daerah | |
3.000.000 |
0 |
0 |
|
|
[-] - | |
3.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Biasa | |
3.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Luar Daerah |
| |
3.000.000 |
0 |
0 |
|
Tahun |
| |
Jumlah Pada Sub Kegiatan | |
531.964.100 |
0 |
0 |
|
| |
Jumlah Pada SKPD | |
531.964.100 |
0 |
0 |
|
|
3.27.0.00.0.00.09.0000 DINAS TANAMAN PANGAN, HORTIKULTURA DAN PERKEBUNAN | |
1.777.678.707 |
0 |
0 |
|
|
3.27.02.2.01.0002 Pendampingan Penggunaan Sarana Pendukung Pertanian | |
827.663.100 |
0 |
0 |
Kegiatan Penyediaan bahan pangan dari komoditas tanaman pangan (hibah, sekolah lapang, pelatihan, pendampingan) |
|
[#] Bantuan Transport Peserta SLPTT Padi | |
5.000.000 |
0 |
0 |
|
|
[-] Bantuan Transport Peserta | |
5.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
5.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
0 |
0 |
0 |
|
Tahun |
| 2 |
Perjalanan Dinas Dalam Daerah |
| |
5.000.000 |
0 |
0 |
|
Tahun |
|
[#] Belanja Perjalanan Dinas | |
6.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Dalam Daerah | |
0 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
0 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
0 |
0 |
0 |
|
Tahun |
|
[-] Perjalanan Dinas Luar Daerah | |
6.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Biasa | |
6.000.000 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Luar Daerah |
| |
6.000.000 |
0 |
0 |
|
Tahun |
| 2 |
Perjalanan Dinas Luar Daerah |
| |
0 |
0 |
0 |
|
Tahun |
|
[#] Pengadaan Benih Jagung Hbrida | |
103.950.000 |
0 |
0 |
|
|
[-] Poktan Gampang Lestari Ds. Truneng Kec. Sukomoro | |
12.600.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
12.600.000 |
0 |
0 |
|
| 1 |
Benih Jagung Hibrida |
NK 212, Bisi 321, dll | |
12.600.000 |
0 |
0 |
|
Kg |
|
[-] Poktan Sido Maju Ds. Truneng Kec. Sukomoro | |
12.600.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
12.600.000 |
0 |
0 |
|
| 1 |
Benih Jagung Hibrida |
NK 212, Bisi 321, dll | |
12.600.000 |
0 |
0 |
|
Kg |
|
[-] Poktan Ngudi Tani II Ds. Lemahbang Kec. Bendo | |
12.600.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
12.600.000 |
0 |
0 |
|
| 1 |
Benih Jagung Hibrida |
NK 212, Bisi 321, dll | |
12.600.000 |
0 |
0 |
|
Kg |
|
[-] Poktan Wono Asri I Ds. Pingkuk Kec. Bendo | |
12.600.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
12.600.000 |
0 |
0 |
|
| 1 |
Benih Jagung Hibrida |
NK 212, Bisi 321, dll | |
12.600.000 |
0 |
0 |
|
Kg |
|
[-] Gapoktan Mugi Rahayu Ds. Wates Kec. Panekan | |
26.775.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
26.775.000 |
0 |
0 |
|
| 1 |
Benih Jagung Hibrida |
NK 212, Bisi 321, dll | |
26.775.000 |
0 |
0 |
|
Kg |
|
[-] Gapoktan Terung Makmur Ds. Terung Kec. Panekan | |
26.775.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
26.775.000 |
0 |
0 |
|
| 1 |
Benih Jagung Hibrida |
NK 212, Bisi 321, dll | |
26.775.000 |
0 |
0 |
|
Kg |
|
[#] Pengadaan Benih Kacang Tanah | |
27.825.000 |
0 |
0 |
|
|
[-] Poktan Eka Tani Ds. Setren Kec. Bendo | |
9.275.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
9.275.000 |
0 |
0 |
|
| 1 |
Benih Kacang Tanah |
Gajah, Situraja,dll | |
9.275.000 |
0 |
0 |
|
Kg |
|
[-] Poktan Sido Mukti Ds. Setren Kec. Bendo | |
9.275.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
9.275.000 |
0 |
0 |
|
| 1 |
Benih Kacang Tanah |
Gajah, Situraja,dll | |
9.275.000 |
0 |
0 |
|
Kg |
|
[-] Poktan Budi Tani Ds. Setren Kec. Bendo | |
9.275.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
9.275.000 |
0 |
0 |
|
| 1 |
Benih Kacang Tanah |
Gajah, Situraja,dll | |
9.275.000 |
0 |
0 |
|
Kg |
|
[#] Pengadaan Benih Padi Inbrida | |
138.600.000 |
0 |
0 |
|
|
[-] Gapoktan Giri Mulyo Ds. Giripurno Kec. Kawedanan | |
25.560.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
25.560.000 |
0 |
0 |
|
| 1 |
Benih Padi Inbrida |
Ciherang, IR 64, Situgabendit,dll | |
25.560.000 |
0 |
0 |
|
Kg |
|
[-] Gapoktan Ngentep Maju Ds. Ngentep Kec. Kawedanan | |
25.560.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
25.560.000 |
0 |
0 |
|
| 1 |
Benih Padi Inbrida |
Ciherang, IR 64, Situgabendit,dll | |
25.560.000 |
0 |
0 |
|
Kg |
|
[-] Gapoktan Ngadirejo Makmur Ds. Ngadirejo Kec. Kawedanan | |
25.560.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
25.560.000 |
0 |
0 |
|
| 1 |
Benih Padi Inbrida |
Ciherang, IR 64, Situgabendit,dll | |
25.560.000 |
0 |
0 |
|
Kg |
|
[-] Gapoktan Makaryo Mugi Mulyo Ds. Dukuh Kec. Lembeyan | |
25.560.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
25.560.000 |
0 |
0 |
|
| 1 |
Benih Padi Inbrida |
Ciherang, IR 64, Situgabendit,dll | |
25.560.000 |
0 |
0 |
|
Kg |
|
[-] Gapoktan Ponco Tani Mudo Tunggur Ds. Tunggur Kec. Lembeyan | |
25.560.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
25.560.000 |
0 |
0 |
|
| 1 |
Benih Padi Inbrida |
Ciherang, IR 64, Situgabendit,dll | |
25.560.000 |
0 |
0 |
|
Kg |
|
[-] Poktan Ngudi Tani I Ds. Lemahbang Kec. Bendo | |
3.600.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
3.600.000 |
0 |
0 |
|
| 1 |
Benih Padi Inbrida |
Ciherang, IR 64, Situgabendit,dll | |
3.600.000 |
0 |
0 |
|
Kg |
|
[-] Poktan Rukun Santoso 1 Ds. Carikan Kec. Bendo | |
3.600.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
3.600.000 |
0 |
0 |
|
| 1 |
Benih Padi Inbrida |
Ciherang, IR 64, Situgabendit,dll | |
3.600.000 |
0 |
0 |
|
Kg |
|
[-] Poktan Rukun Santoso 2 Ds. Carikan Kec. Bendo | |
3.600.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
3.600.000 |
0 |
0 |
|
| 1 |
Benih Padi Inbrida |
Ciherang, IR 64, Situgabendit,dll | |
3.600.000 |
0 |
0 |
|
Kg |
|
[#] Bahan Dem & Bahan Percontohan | |
432.932.500 |
0 |
0 |
|
|
[-] Bahan Dem & Percontohan | |
379.472.500 |
0 |
0 |
|
|
Belanja Bahan-Bahan/Bibit Tanaman | |
12.600.000 |
0 |
0 |
|
| 1 |
Benih Jagung Hibrida |
NK 212, Bisi 321, dll | |
12.600.000 |
0 |
0 |
|
Kg |
|
Belanja Bahan-Bahan Lainnya | |
366.872.500 |
0 |
0 |
|
| 1 |
Pupuk NPK |
Pupuk Majemuk, Mengandung (N, P2O5, K2O), Bentuk Granul, Warna Biru | |
14.200.000 |
0 |
0 |
|
Kg |
| 2 |
Pupuk Urea |
Non Subsidi, Granule | |
3.850.000 |
0 |
0 |
|
Kg |
| 3 |
Pupuk Organik |
Bentuk Granul | |
303.810.000 |
0 |
0 |
|
Kg |
| 4 |
Pembenah tanah/Aktivator Kompos |
Pengurai kompos pertanian, dekomposer | |
45.012.500 |
0 |
0 |
|
Kg |
|
[-] Bahan Untuk DEM IP 400 & SLPTT Padi | |
53.460.000 |
0 |
0 |
|
|
Belanja Bahan-Bahan/Bibit Tanaman | |
53.460.000 |
0 |
0 |
|
| 1 |
Benih Padi Inbrida |
Ciherang, IR 64, Situgabendit,dll | |
53.460.000 |
0 |
0 |
|
Kg |
|
[#] Belanja Alat Tulis Kantor | |
3.872.100 |
0 |
0 |
|
|
[-] ATK SLPTT Padi | |
733.000 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
733.000 |
0 |
0 |
|
| 1 |
BallPoint |
Biasa | |
100.000 |
0 |
0 |
|
Buah |
| 2 |
Spidol |
Whiteboard/ boardmarker | |
139.800 |
0 |
0 |
|
Buah |
| 3 |
Buku Block Note |
Garis / isi 40 Lembar | |
107.500 |
0 |
0 |
|
Buah |
| 4 |
Stop Map |
Kantong/ plastik kancing | |
135.000 |
0 |
0 |
|
Buah |
| 5 |
Plakband |
Hitam Besar | |
88.200 |
0 |
0 |
|
Buah |
| 6 |
Kertas Payung |
| |
162.500 |
0 |
0 |
|
Buah |
|
[-] ATK Kegiatan | |
3.139.100 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
3.139.100 |
0 |
0 |
|
| 1 |
BallPoint |
Biasa | |
204.000 |
0 |
0 |
|
Buah |
| 2 |
Spidol |
Marker/Permanen | |
126.600 |
0 |
0 |
|
Buah |
| 3 |
Stabilo |
| |
67.800 |
0 |
0 |
|
Buah |
| 4 |
Binder Clip |
No. 105 | |
129.000 |
0 |
0 |
|
Dus |
| 5 |
Binder Clip |
No. 107 | |
77.500 |
0 |
0 |
|
Dus |
| 6 |
Binder Clip |
No. 111 | |
129.000 |
0 |
0 |
|
Dus |
| 7 |
Binder Clip |
No. 155 | |
193.500 |
0 |
0 |
|
Dus |
| 8 |
Binder Clip |
No. 200 | |
161.250 |
0 |
0 |
|
Dus |
| 9 |
Binder Clip |
No. 260 | |
204.250 |
0 |
0 |
|
Dus |
| 10 |
Correction Pen |
| |
42.000 |
0 |
0 |
|
Buah |
| 11 |
HVS 70 Gr |
F4 | |
1.242.700 |
0 |
0 |
|
Rim |
| 12 |
HVS 80 Gr |
A4 | |
147.200 |
0 |
0 |
|
Rim |
| 13 |
Kertas Ncr Middle |
Ukuran F4 | |
204.750 |
0 |
0 |
|
Rim |
| 14 |
Kertas Ncr Top |
Ukuran F4 | |
209.550 |
0 |
0 |
|
Rim |
|
[#] Belanja Cetak | |
3.207.800 |
0 |
0 |
|
|
[-] Cetak Banner untuk Event Kegiatan | |
951.000 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
951.000 |
0 |
0 |
|
| 1 |
cetak banner |
print digital (1mx1m) | |
951.000 |
0 |
0 |
|
M2 |
|
[-] Photo copy/Penggandaan | |
2.256.800 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
2.256.800 |
0 |
0 |
|
| 1 |
Photo Copy |
HVS A4/F4 70 gr | |
2.256.800 |
0 |
0 |
|
Lembar |
|
[#] Belanja Benda Pos | |
711.000 |
0 |
0 |
|
|
[-] Materai | |
711.000 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Benda Pos | |
711.000 |
0 |
0 |
|
| 1 |
Materai |
Materai 10.000 | |
711.000 |
0 |
0 |
|
Buah |
|
[#] Belanja Bahan Komputer | |
1.473.600 |
0 |
0 |
|
|
[-] Bahan Komputer | |
1.473.600 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer | |
1.473.600 |
0 |
0 |
|
| 1 |
Tinta Printer |
664, 4 warna | |
773.600 |
0 |
0 |
|
Set |
| 2 |
Tinta Printer |
Tinta Printer 003 | |
700.000 |
0 |
0 |
|
Botol |
| 3 |
Mouse |
Wireless | |
0 |
0 |
0 |
|
Unit |
|
[#] Honorarium Tim Pelaksana Kegiatan | |
0 |
0 |
0 |
|
|
[-] Tim Pelaksana Kegiatan | |
0 |
0 |
0 |
|
|
Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | |
0 |
0 |
0 |
|
| 1 |
Pejabat Pelaksana Teknis Kegiatan (PPTK) |
Nilai pagu dana di atas Rp. 500 juta s.d. Rp.1 miliar | |
0 |
0 |
0 |
|
Orang / Bulan |
| 2 |
Staf Tehnis / Administrasi PPTK |
Nilai pagu dana di atas Rp. 500 juta s.d. Rp.1 miliar | |
0 |
0 |
0 |
|
Orang / Bulan |
|
[#] Belanja Manmin Rapat Koordinasi/Sosialisasi/Evaluasi/Pelatihan | |
12.241.100 |
0 |
0 |
|
|
[-] Manmin Rapat Koordinasi/Sosialisasi/Evaluasi/Pelatihan | |
12.241.100 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
12.241.100 |
0 |
0 |
|
| 1 |
Nasi Kotak |
Biasa | |
8.350.000 |
0 |
0 |
|
Box |
| 2 |
Snack Kotak |
Biasa | |
3.891.100 |
0 |
0 |
|
Box |
|
[#] Honorarium Narasumber Event Kegiatan | |
29.100.000 |
0 |
0 |
|
|
[-] Honor Narasumber Event Kegiatan | |
29.100.000 |
0 |
0 |
|
|
Honorarium Narasumber atau Pembahas, Moderator, Pembawa Acara, dan Panitia | |
29.100.000 |
0 |
0 |
|
| 1 |
Honorarium Narasumber |
Narasumber Non PNS : organisasi profesi, surveior | |
9.900.000 |
0 |
0 |
|
Orang / Jam |
| 2 |
Narasumber/ Pembahas/ Tenaga Ahli |
Pejabat Eselon II / yang disetarakan | |
8.000.000 |
0 |
0 |
|
Orang / Jam |
| 3 |
Honorarium Narasumber |
Kepala Daerah/ Pejabat Setingkat Kepala Daerah/ Pejabat Daerah Lainnya yang disetarakan (Forkopimda) | |
11.200.000 |
0 |
0 |
|
Orang / Jam |
|
[#] Honorarium Narasumbedir SLPTT Padi | |
4.500.000 |
0 |
0 |
|
|
[-] Honor Narasumber | |
4.500.000 |
0 |
0 |
|
|
Honorarium Narasumber atau Pembahas, Moderator, Pembawa Acara, dan Panitia | |
4.500.000 |
0 |
0 |
|
| 1 |
Narasumber/ Pembahas/ Tenaga Ahli |
Pejabat Eselon III ke bawah / yang disetarakan | |
4.500.000 |
0 |
0 |
|
Orang / Jam |
|
[#] Jasa Tenaga Teknis Pertanian dan pangan | |
53.250.000 |
0 |
0 |
|
|
[-] Tenaga Kerja Untuk Dem & Percontohan | |
43.350.000 |
0 |
0 |
|
|
Belanja Jasa Tenaga Teknis Pertanian dan Pangan | |
43.350.000 |
0 |
0 |
|
| 1 |
Tenaga kerja bidang pertanian/perkebunan |
Tenaga Terampil | |
43.350.000 |
0 |
0 |
|
Orang / Hari |
|
[-] Sewa Excavator untuk olah lahan | |
9.900.000 |
0 |
0 |
|
|
Belanja Jasa Tenaga Teknis Pertanian dan Pangan | |
9.900.000 |
0 |
0 |
|
| 1 |
Sewa Eksavator |
- | |
9.900.000 |
0 |
0 |
|
Hari |
|
[#] Tanam Serentak & Panen Raya Padi & Jagung | |
0 |
0 |
0 |
|
|
[-] Jasa Kebersihan | |
0 |
0 |
0 |
|
|
Belanja Jasa Tenaga Kebersihan | |
0 |
0 |
0 |
|
| 1 |
Petugas Kebersihan |
- | |
0 |
0 |
0 |
|
Orang / Kali |
|
[#] Belanja Publikasi Kegiatan | |
5.000.000 |
0 |
0 |
|
|
[-] Publikasi event kegiatan | |
5.000.000 |
0 |
0 |
|
|
Belanja Jasa Iklan/Reklame, Film, dan Pemotretan | |
5.000.000 |
0 |
0 |
|
| 1 |
Belanja Publikasi Media Cetak, Elektronik dan Online |
Paket Belanja Publikasi selama 1 Tahun | |
5.000.000 |
0 |
0 |
|
Paket |
| |
Jumlah Pada Sub Kegiatan | |
827.663.100 |
0 |
0 |
|
|
3.27.02.2.02.0003 Pemanfaatan SDG Hewan/Tanaman | |
950.015.607 |
0 |
0 |
Kegiatan penyediaan bahan pangan komoditas hortikultura (hibah, DEM, gelar potensi) |
|
[#] Hadiah Lomba Gelar Potensi P2L | |
3.687.450 |
0 |
0 |
|
|
[-] Hadiah Lomba Gelar Potensi P2L | |
3.687.450 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Suvenir/Cendera Mata | |
687.450 |
0 |
0 |
|
| 1 |
Trophy Kaki Satu |
Bahan: Plastik, Tinggi: 55 cm | |
687.450 |
0 |
0 |
|
Set |
|
Belanja Hadiah yang Bersifat Perlombaan | |
3.000.000 |
0 |
0 |
|
| 1 |
Hadiah Lomba/Uang Pembinaan |
Bersifat Perlombaan/Kompetisi/Penghargaan | |
3.000.000 |
0 |
0 |
|
Paket |
|
[#] Sarana Prasarana Pengembangan P2L | |
8.100.000 |
0 |
0 |
|
|
[-] Sarana Prasarana Pengembangan P2L | |
8.100.000 |
0 |
0 |
|
|
Belanja Bahan-Bahan Bangunan dan Konstruksi | |
4.225.000 |
0 |
0 |
|
| 1 |
Plastik UV |
(Lebar 3M) | |
4.225.000 |
0 |
0 |
|
Meter |
|
Belanja Suku Cadang-Suku Cadang Alat Pertanian | |
3.875.000 |
0 |
0 |
|
| 1 |
Polybag |
Material Plastik | |
1.425.000 |
0 |
0 |
|
Kg |
| 2 |
Paranet |
Anyaman Jaring Plastik/Nylon,Polyetilen | |
2.450.000 |
0 |
0 |
|
Meter |
|
[#] Benih DEM Pengembangan P2L | |
50.115.000 |
0 |
0 |
|
|
[-] Benih DEM Pengembangan P2L | |
50.115.000 |
0 |
0 |
|
|
Belanja Bahan-Bahan/Bibit Tanaman | |
50.115.000 |
0 |
0 |
|
| 1 |
Benih labu madu |
Isi 100 biji | |
8.000.000 |
0 |
0 |
|
Pack |
| 2 |
Benih Bayam Cabut |
| |
2.210.000 |
0 |
0 |
|
Pak |
| 3 |
Benih Brokoli |
| |
7.197.500 |
0 |
0 |
|
Sachet |
| 4 |
Benih Cabe Besar |
Hybrid, 20 gr | |
10.880.000 |
0 |
0 |
|
Sachet |
| 5 |
Benih Cabe Rawit |
Hybrid, 20 gr | |
6.920.000 |
0 |
0 |
|
Sachet |
| 6 |
Benih Kangkung |
500 gr | |
5.150.000 |
0 |
0 |
|
Per Bungkus |
| 7 |
Benih Sawi |
100 gr | |
3.322.500 |
0 |
0 |
|
Per Bungkus |
| 8 |
Benih Terong |
Biji | |
3.190.000 |
0 |
0 |
|
Sachet |
| 9 |
Benih Tomat |
| |
3.245.000 |
0 |
0 |
|
Pak |
|
[#] DEM Buah-Buahan (DID) | |
53.628.500 |
0 |
0 |
|
|
[-] DEM Buah-Buahan (DID) | |
53.628.500 |
0 |
0 |
|
|
Belanja Bahan-Bahan/Bibit Tanaman | |
53.628.500 |
0 |
0 |
|
| 1 |
Petai |
Okulasi / Sambung 60 - 100 | |
8.503.250 |
0 |
0 |
|
Batang |
| 2 |
Alpukat |
Grafting Tinggi = 60 cm | |
13.290.000 |
0 |
0 |
|
Batang |
| 3 |
Jambu Air Citra |
Okulasi Tinggi = 80 cm | |
12.920.000 |
0 |
0 |
|
Batang |
| 4 |
Jambu Biji Sukun |
Okulasi 30-60 | |
5.678.250 |
0 |
0 |
|
Batang |
| 5 |
Mangga |
Lokal Okulasi 30 - 60 | |
4.265.000 |
0 |
0 |
|
Batang |
| 6 |
Sawo |
Okulasi 30-60 | |
4.985.000 |
0 |
0 |
|
Batang |
| 7 |
Sukun |
Stek / Cangkok40 - 70 | |
3.987.000 |
0 |
0 |
|
Batang |
|
[#] DEM SAYURAN (DID) | |
195.768.000 |
0 |
0 |
|
|
[-] DEM SAYURAN (DID) | |
195.768.000 |
0 |
0 |
|
|
Belanja Bahan-Bahan/Bibit Tanaman | |
195.768.000 |
0 |
0 |
|
| 1 |
Benih Cabe Keriting |
| |
12.718.000 |
0 |
0 |
|
Batang |
| 2 |
Benih Cabe Rawit |
| |
12.530.000 |
0 |
0 |
|
Batang |
| 3 |
Benih Bawang Merah |
| |
170.520.000 |
0 |
0 |
|
Kg |
|
[#] Obat-obatan Lainnya untuk DEM (DID) | |
50.765.760 |
0 |
0 |
|
|
[-] Obat-obatan Lainnya untuk DEM (DID) | |
50.765.760 |
0 |
0 |
|
|
Belanja Obat-Obatan-Obat-Obatan Lainnya | |
50.765.760 |
0 |
0 |
|
| 1 |
Pupuk NPK |
Non Subsidi, 16;16;16 Warna Biru | |
39.870.000 |
0 |
0 |
|
Kg |
| 2 |
Pupuk Hayati |
Padat-Dekomposer Decoprima, Kemasan 1 Sachet = 100 gram | |
10.895.760 |
0 |
0 |
|
Sachet |
|
[#] ATK Hortikultura (BU) | |
2.252.650 |
0 |
0 |
|
|
[-] ATK Hortikultura (BU) | |
2.252.650 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
2.252.650 |
0 |
0 |
|
| 1 |
Binder Clip |
No. 200 | |
0 |
0 |
0 |
|
Dus |
| 2 |
Snelhecter Map |
2001/P | |
33.950 |
0 |
0 |
|
Buah |
| 3 |
Snelhecter Map |
Plastik | |
0 |
0 |
0 |
|
Buah |
| 4 |
Stop Map |
Kertas | |
0 |
0 |
0 |
|
Buah |
| 5 |
HVS 70 Gr |
F4 | |
1.681.300 |
0 |
0 |
|
Rim |
| 6 |
Kertas Ncr Bottom |
Ukuran F4 | |
258.000 |
0 |
0 |
|
Rim |
| 7 |
Kertas Ncr Top |
Ukuran F4 | |
279.400 |
0 |
0 |
|
Rim |
|
[#] Pembulatan (DID) | |
140 |
0 |
0 |
|
|
[-] Pembulatan (DID) | |
140 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
140 |
0 |
0 |
|
| 1 |
Pembulatan/Penyesuaian |
| |
140 |
0 |
0 |
|
Rupiah |
|
[#] Pembulatan (DAU) | |
1.207 |
0 |
0 |
|
|
[-] Pembulatan (DAU) | |
1.207 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor | |
1.207 |
0 |
0 |
|
| 1 |
Pembulatan/Penyesuaian |
| |
1.207 |
0 |
0 |
|
Rupiah |
|
[#] Penggandaan (BU) | |
932.400 |
0 |
0 |
|
|
[-] Penggandaan (BU) | |
932.400 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak | |
932.400 |
0 |
0 |
|
| 1 |
Photo Copy |
HVS, F4 70 gr | |
932.400 |
0 |
0 |
|
Lembar |
|
[#] Belanja Materai (BU) | |
474.000 |
0 |
0 |
|
|
[-] Materai (BU) | |
474.000 |
0 |
0 |
|
|
Belanja Alat/Bahan untuk Kegiatan Kantor-Benda Pos | |
474.000 |
0 |
0 |
|
| 1 |
Materai |
Materai 10.000 | |
474.000 |
0 |
0 |
|
Buah |
|
[#] Hibah Barang / Jasa yang diserahkan kepada masyarakat | |
209.970.000 |
0 |
0 |
|
|
[-] Poktan Sido Makmur Ds. Plangkrongan Kec. Poncol | |
29.902.500 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
29.902.500 |
0 |
0 |
|
| 1 |
Alpukat |
Grafting Tinggi = 60 cm | |
29.902.500 |
0 |
0 |
|
Batang |
|
[-] Poktan Kalang Asri Ds. Kalang Kec. Sidorejo | |
29.902.500 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
29.902.500 |
0 |
0 |
|
| 1 |
Alpukat |
Grafting Tinggi = 60 cm | |
29.902.500 |
0 |
0 |
|
Batang |
|
[-] Gapoktan Tani Sampurno Ds. Getasanyar Kec. Sidorejo | |
29.902.500 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
29.902.500 |
0 |
0 |
|
| 1 |
Alpukat |
Grafting Tinggi = 60 cm | |
29.902.500 |
0 |
0 |
|
Batang |
|
[-] Gapoktan Sumber Mulyo Ds. Sumbersawit Kec. Sidorejo | |
29.902.500 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
29.902.500 |
0 |
0 |
|
| 1 |
Alpukat |
Grafting Tinggi = 60 cm | |
29.902.500 |
0 |
0 |
|
Batang |
|
[-] Gapoktan Maju Makmur Ds. Jabung Kec. Panekan | |
30.120.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
30.120.000 |
0 |
0 |
|
| 1 |
Durian |
Unggul Nasional Okulasi 30 - 60 | |
30.120.000 |
0 |
0 |
|
Batang |
|
[-] Gapoktan Sumber Makmur Ds. Ngiliran Kec. Panekan | |
30.120.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
30.120.000 |
0 |
0 |
|
| 1 |
Durian |
Unggul Nasional Okulasi 30 - 60 | |
30.120.000 |
0 |
0 |
|
Batang |
|
[-] Gapoktan Murakapi Ds. Sukowidi Kec. Panekan | |
30.120.000 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
30.120.000 |
0 |
0 |
|
| 1 |
Durian |
Unggul Nasional Okulasi 30 - 60 | |
30.120.000 |
0 |
0 |
|
Batang |
|
[#] Hibah Barang/Jasa diserahkan kepada Masyarakat (DID) | |
106.187.100 |
0 |
0 |
|
|
[-] Poktan Duwok Ds. Kepurejo Kec. Takeran | |
16.612.500 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
16.612.500 |
0 |
0 |
|
| 1 |
Jeruk Besar |
Okulasi / Sambung 60 - 100 | |
16.612.500 |
0 |
0 |
|
Batang |
|
[-] Gapoktan Duta Tani Ds. Kepurejo Kec. Takeran | |
56.349.600 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
56.349.600 |
0 |
0 |
|
| 1 |
Jeruk Besar |
Okulasi / Sambung 60 - 100 | |
56.349.600 |
0 |
0 |
|
Batang |
|
[-] Poktan Mapan Ds. Kepurejo Kec. Takeran | |
16.612.500 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
16.612.500 |
0 |
0 |
|
| 1 |
Jeruk Besar |
Okulasi / Sambung 60 - 100 | |
16.612.500 |
0 |
0 |
|
Batang |
|
[-] Poktan Ngudi Makmur Ds. Sukomro Kec. Sukomoro | |
16.612.500 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | |
16.612.500 |
0 |
0 |
|
| 1 |
Jeruk Besar |
Okulasi / Sambung 60 - 100 | |
16.612.500 |
0 |
0 |
|
Batang |
|
[#] Honorarium Pejabat Pengadaan Barang Jasa (BU) | |
1.600.000 |
0 |
0 |
|
|
[-] Honorarium Pejabat Pengadaan Barang Jasa (BU) | |
1.600.000 |
0 |
0 |
|
|
Belanja Honorarium Pengadaan Barang/Jasa | |
1.600.000 |
0 |
0 |
|
| 1 |
Pejabat Pengadaan Pekerjaan Konstruksi/ Barang/ Jasa Lainnya - Ketua |
Nilai pagu dana s.d. Rp. 50 Juta | |
1.600.000 |
0 |
0 |
|
Paket |
|
[#] Manmin Rapat (DID) | |
2.052.400 |
0 |
0 |
|
|
[-] Manmin Rapat (DID) | |
2.052.400 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
2.052.400 |
0 |
0 |
|
| 1 |
Nasi Kotak |
Biasa | |
1.400.000 |
0 |
0 |
|
Box |
| 2 |
Snack Kotak |
Biasa | |
652.400 |
0 |
0 |
|
Box |
|
[#] Makan Minum Gelar Potensi P2L | |
1.466.000 |
0 |
0 |
|
|
[-] Makan Minum Gelar Potensi P2L | |
1.466.000 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
1.466.000 |
0 |
0 |
|
| 1 |
Nasi Kotak |
Biasa | |
1.000.000 |
0 |
0 |
|
Box |
| 2 |
Snack Kotak |
Biasa | |
466.000 |
0 |
0 |
|
Box |
|
[#] Honorarium Narasumber (DID) | |
5.400.000 |
0 |
0 |
|
|
[-] Honorarium Narasumber (DID) | |
5.400.000 |
0 |
0 |
|
|
Honorarium Narasumber atau Pembahas, Moderator, Pembawa Acara, dan Panitia | |
5.400.000 |
0 |
0 |
|
| 1 |
Honorarium Narasumber |
Narasumber Non PNS : organisasi profesi, surveior | |
5.400.000 |
0 |
0 |
|
Orang / Jam |
|
[#] Narasumber Pengembangan P2L | |
16.400.000 |
0 |
0 |
|
|
[-] Narasumber Pengembangan P2L | |
16.400.000 |
0 |
0 |
|
|
Honorarium Narasumber atau Pembahas, Moderator, Pembawa Acara, dan Panitia | |
16.400.000 |
0 |
0 |
|
| 1 |
Narasumber/ Pembahas/ Tenaga Ahli |
Pejabat Eselon III ke bawah / yang disetarakan | |
10.800.000 |
0 |
0 |
|
Orang / Jam |
| 2 |
Honorarium Narasumber |
Kepala Daerah/ Pejabat Setingkat Kepala Daerah/ Pejabat Daerah Lainnya yang disetarakan (Forkopimda) | |
5.600.000 |
0 |
0 |
|
Orang / Jam |
|
[#] Upah Tenaga Kerja Harian Kebun Dinas (DID) | |
83.215.000 |
0 |
0 |
|
|
[-] Upah Tenaga Kerja Harian Kebun Dinas (DID) | |
83.215.000 |
0 |
0 |
|
|
Belanja Jasa Tenaga Teknis Pertanian dan Pangan | |
83.215.000 |
0 |
0 |
|
| 1 |
Tenaga kerja bidang pertanian/perkebunan |
Tenaga Terampil | |
83.215.000 |
0 |
0 |
|
Orang / Hari |
|
[#] Jasa Publikasi | |
1.000.000 |
0 |
0 |
|
|
[-] Jasa Publikasi | |
1.000.000 |
0 |
0 |
|
|
Belanja Jasa Iklan/Reklame, Film, dan Pemotretan | |
1.000.000 |
0 |
0 |
|
| 1 |
Publikasi |
Melalui Media Cetak/Elektronik | |
1.000.000 |
0 |
0 |
|
Paket |
|
[#] Jasa penelitian kerjasama dengan BRIN (DID) | |
150.000.000 |
0 |
0 |
|
|
[-] Jasa penelitian kerjasama dengan BRIN (DID) | |
150.000.000 |
0 |
0 |
|
|
Belanja Jasa Konsultansi Berorientasi Layanan-Jasa Studi Penelitian dan Bantuan Teknik | |
150.000.000 |
0 |
0 |
|
| 1 |
Jasa Konsultansi Penelitian |
- | |
150.000.000 |
0 |
0 |
|
Paket |
|
[#] Perjalanan Dinas Luar Daerah (BU) | |
5.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Luar Daerah (BU) | |
5.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Biasa | |
5.000.000 |
0 |
0 |
|
| 1 |
Pembulatan/Penyesuaian |
| |
5.000.000 |
0 |
0 |
|
Rupiah |
|
[#] Pendampingan Pengembangan P2L | |
0 |
0 |
0 |
|
|
[-] Pendampingan Pengembangan P2L | |
0 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
0 |
0 |
0 |
|
| 1 |
Perjalanan Dinas Dalam Daerah |
| |
0 |
0 |
0 |
|
Tahun |
|
[#] Perjalanan Dinas Dalam Daerah (BU) | |
2.000.000 |
0 |
0 |
|
|
[-] Perjalanan Dinas Dalam Daerah (BU) | |
2.000.000 |
0 |
0 |
|
|
Belanja Perjalanan Dinas Dalam Kota | |
2.000.000 |
0 |
0 |
|
| 1 |
Pembulatan/Penyesuaian |
| |
2.000.000 |
0 |
0 |
|
Rupiah |
| |
Jumlah Pada Sub Kegiatan | |
950.015.607 |
0 |
0 |
|
| |
Jumlah Pada SKPD | |
1.777.678.707 |
0 |
0 |
|
|
3.27.3.25.0.00.01.0000 DINAS PETERNAKAN DAN PERIKANAN | |
10.207.924.364 |
0 |
0 |
|
|
3.25.04.2.04.0002 Penyediaan Prasarana Pembudidayaan Ikan dalam 1 (Satu) Daerah Kabupaten/Kota | |
230.000.000 |
0 |
0 |
|
|
[#] Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar | |
230.000.000 |
0 |
0 |
|
|
[-] Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar | |
230.000.000 |
0 |
0 |
|
|
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar | |
230.000.000 |
0 |
0 |
|
| 1 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
230.000.000 |
0 |
0 |
|
Paket |
| |
Jumlah Pada Sub Kegiatan | |
230.000.000 |
0 |
0 |
|
|
3.27.02.2.02.0002 Peningkatan Kualitas SDG Hewan/Tanaman | |
18.962.402 |
0 |
0 |
|
|
[#] Belanja Obat Obatan Ternak | |
3.842.352 |
0 |
0 |
|
|
[-] Obat Obatan Ternak | |
3.842.352 |
0 |
0 |
|
|
Belanja Obat-Obatan-Obat-Obatan Lainnya | |
3.842.352 |
0 |
0 |
|
| 1 |
Calcidex Plus |
100 Ml | |
375.250 |
0 |
0 |
|
Botol |
| 2 |
Injectamin |
100 Ml | |
750.000 |
0 |
0 |
|
Botol |
| 3 |
Vetadryl Inj |
100 Ml | |
264.250 |
0 |
0 |
|
Botol |
| 4 |
Vet-Oxy La |
100 Ml | |
431.250 |
0 |
0 |
|
Botol |
| 5 |
Vitamin Vet B-1 |
100 ml Vitamin B1 (Thiamin HCl) 100 mg/mL | |
293.224 |
0 |
0 |
|
Botol |
| 6 |
VERM O |
42 bolus | |
510.166 |
0 |
0 |
|
Box |
| 7 |
Antibiotik Injeksi |
Kemasan 100 ml | |
256.464 |
0 |
0 |
|
Botol |
| 8 |
Larvasidal Spray |
Gusanex | |
961.748 |
0 |
0 |
|
Botol |
|
[#] Belanja Bahan Olahan Susu | |
5.126.250 |
0 |
0 |
|
|
[-] Belanja Bahan Olahan Susu | |
5.126.250 |
0 |
0 |
|
|
Belanja Natura dan Pakan-Natura | |
5.126.250 |
0 |
0 |
|
| 1 |
Gula jawa |
Bahan Nira Kelapa, Bentuk Bulat Lempeng | |
2.647.500 |
0 |
0 |
|
Kg |
| 2 |
Jahe |
Tua, segar | |
2.478.750 |
0 |
0 |
|
Kg |
|
[#] Makanan dan minuman pelatihan | |
9.993.800 |
0 |
0 |
|
|
[-] Mamin Pelatihan | |
9.993.800 |
0 |
0 |
|
|
Belanja Makanan dan Minuman Rapat | |
9.993.800 |
0 |
0 |
|
| 1 |
Nasi Kotak |
Biasa | |
6.825.000 |
0 |
0 |
|
Box |
| 2 |
Snack Kotak |
Biasa | |
3.168.800 |
0 |
0 |
|
Box |
| |
Jumlah Pada Sub Kegiatan | |
18.962.402 |
0 |
0 |
|
|
3.27.02.2.03.0001 Pengawasan Mutu Benih/Bibit Ternak, Bahan Pakan/Pakan/Tanaman Skala Kecil | |
129.904.000 |
0 |
0 |
|
|
[#] Belanja Natura dan Pakan-Pakan (Konsentrat Ternak) | |
125.404.000 |
0 |
0 |
|
|
[-] Belanja Natura dan Pakan-Pakan (Konsentrat Ternak) | |
125.404.000 |
0 |
0 |
|
|
Belanja Natura dan Pakan-Pakan | |
125.404.000 |
0 |
0 |
|
| 1 |
Konsentrat Kambing |
Kadar Air Max. 14% ; Protein Kasar 12%; Kemasan Karung ; Tidak Ada Cemaran Fisik, Biologi Dan Kimia | |
10.200.000 |
0 |
0 |
|
Kg |
| 2 |
Konsentrat Sapi Perah |
Kadar Air Max. 14% ; Protein Kasar Min 14%; Kemasan Karung ; Tidak Ada Cemaran Fisik, Biologi Dan Kimia | |
85.682.750 |
0 |
0 |
|
Kg |
| 3 |
Konsentrat Sapi Potong |
Kadar Air Max. 14% ; Protein Kasar Min 12% Kemasan Karung ; Tidak Ada Cemaran Fisik, Biologi Dan Kimia | |
29.521.250 |
0 |
0 |
|
Kg |
|
[#] Belanja Jasa Tenaga Laboratorium - Uji Laboratorium Pakan Ternak | |
4.500.000 |
0 |
0 |
|
|
[-] Belanja Jasa Tenaga Laboratorium - Uji Laboratorium Pakan Ternak | |
4.500.000 |
0 |
0 |
|
|
Belanja Jasa Tenaga Laboratorium | |
4.500.000 |
0 |
0 |
|
| 1 |
Uji Laboratorium Pakan Ternak |
Uji Proksimat | |
4.500.000 |
0 |
0 |
|
Sampel |
| |
Jumlah Pada Sub Kegiatan | |
129.904.000 |
0 |
0 |
|
|
3.27.02.2.03.0002 Pengawasan Peredaran Bahan Pakan/Pakan, Benih/Bibit Hijauan Pakan Ternak | |
14.233.100 |
0 |
0 |
|
|
[#] Belanja Natura Pakan dan Pakan - Tebon Jagung | |
12.500.000 |
0 |
0 |
|
|
[-] Belanja Natura Pakan dan Pakan - Tebon Jagung | |
12.500.000 |
0 |
0 |
|
|
Belanja Natura dan Pakan-Pakan | |
12.500.000 |
0 |
0 |
|
| 1 |
Tebon Jagung |
Umur Panen Min. 60 Hari; Segar, Tidak Layu; Berwarna Hijau Daun | |
12.500.000 |
0 |
0 |
|
Kg |
|
[#] Belanja Natura Pakan dan Pakan - Jerami Padi | |
1.733.100 |
0 |
0 |
|
|
[-] Belanja Natura Pakan dan Pakan - Jerami Padi | |
1.733.100 |
0 |
0 |
|
|
Belanja Natura dan Pakan-Pakan | |
1.733.100 |
0 |
0 |
|
| 1 |
Jerami Padi |
KERING, TIDAK BERJAMUR, SEGAR | |
1.733.100 |
0 |
0 |
|
Pick Up |
| |
Jumlah Pada Sub Kegiatan | |
14.233.100 |
0 |
0 |
|
|
3.27.02.2.05.0008 Penjaminan Peredaran Benih/Bibit Ternak | |
8.942.000.000 |
0 |
0 |
|
|
[#] Hibah Uang | |
8.792.000.000 |
0 |
0 |
|
|
[-] Hibah Uang | |
8.792.000.000 |
0 |
0 |
|
|
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar | |
8.792.000.000 |
0 |
0 |
|
| 1 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
125.000.000 |
0 |
0 |
|
Pekerjaan |
| 2 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
70.000.000 |
0 |
0 |
|
Pekerjaan |
| 3 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
50.000.000 |
0 |
0 |
|
Pekerjaan |
| 4 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
50.000.000 |
0 |
0 |
|
Pekerjaan |
| 5 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
70.000.000 |
0 |
0 |
|
Pekerjaan |
| 6 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
70.000.000 |
0 |
0 |
|
Pekerjaan |
| 7 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
50.000.000 |
0 |
0 |
|
Pekerjaan |
| 8 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
40.000.000 |
0 |
0 |
|
Pekerjaan |
| 9 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
50.000.000 |
0 |
0 |
|
Pekerjaan |
| 10 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
45.000.000 |
0 |
0 |
|
Pekerjaan |
| 11 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
60.000.000 |
0 |
0 |
|
Pekerjaan |
| 12 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
60.000.000 |
0 |
0 |
|
Pekerjaan |
| 13 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
40.000.000 |
0 |
0 |
|
Pekerjaan |
| 14 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
60.000.000 |
0 |
0 |
|
Pekerjaan |
| 15 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 16 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 17 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 18 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 19 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 20 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
80.000.000 |
0 |
0 |
|
Pekerjaan |
| 21 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 22 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 23 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
45.000.000 |
0 |
0 |
|
Pekerjaan |
| 24 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 25 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 26 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
150.000.000 |
0 |
0 |
|
Pekerjaan |
| 27 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
150.000.000 |
0 |
0 |
|
Pekerjaan |
| 28 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 29 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 30 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 31 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
30.000.000 |
0 |
0 |
|
Pekerjaan |
| 32 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
210.000.000 |
0 |
0 |
|
Pekerjaan |
| 33 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
25.000.000 |
0 |
0 |
|
Pekerjaan |
| 34 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 35 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 36 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
130.000.000 |
0 |
0 |
|
Pekerjaan |
| 37 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
125.000.000 |
0 |
0 |
|
Pekerjaan |
| 38 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 39 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
70.000.000 |
0 |
0 |
|
Pekerjaan |
| 40 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 41 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 42 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
35.000.000 |
0 |
0 |
|
Pekerjaan |
| 43 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
30.000.000 |
0 |
0 |
|
Pekerjaan |
| 44 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
35.000.000 |
0 |
0 |
|
Pekerjaan |
| 45 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
25.000.000 |
0 |
0 |
|
Pekerjaan |
| 46 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
80.000.000 |
0 |
0 |
|
Pekerjaan |
| 47 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
220.000.000 |
0 |
0 |
|
Pekerjaan |
| 48 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 49 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 50 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 51 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 52 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 53 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
200.000.000 |
0 |
0 |
|
Pekerjaan |
| 54 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
150.000.000 |
0 |
0 |
|
Pekerjaan |
| 55 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
150.000.000 |
0 |
0 |
|
Pekerjaan |
| 56 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
52.000.000 |
0 |
0 |
|
Pekerjaan |
| 57 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
50.000.000 |
0 |
0 |
|
Pekerjaan |
| 58 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
75.000.000 |
0 |
0 |
|
Pekerjaan |
| 59 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
40.000.000 |
0 |
0 |
|
Pekerjaan |
| 60 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
150.000.000 |
0 |
0 |
|
Pekerjaan |
| 61 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 62 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
200.000.000 |
0 |
0 |
|
Pekerjaan |
| 63 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 64 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 65 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
40.000.000 |
0 |
0 |
|
Pekerjaan |
| 66 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
200.000.000 |
0 |
0 |
|
Pekerjaan |
| 67 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
200.000.000 |
0 |
0 |
|
Pekerjaan |
| 68 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
200.000.000 |
0 |
0 |
|
Pekerjaan |
| 69 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
50.000.000 |
0 |
0 |
|
Pekerjaan |
| 70 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
50.000.000 |
0 |
0 |
|
Pekerjaan |
| 71 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
60.000.000 |
0 |
0 |
|
Pekerjaan |
| 72 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
60.000.000 |
0 |
0 |
|
Pekerjaan |
| 73 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
150.000.000 |
0 |
0 |
|
Pekerjaan |
| 74 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
170.000.000 |
0 |
0 |
|
Pekerjaan |
| 75 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
200.000.000 |
0 |
0 |
|
Pekerjaan |
| 76 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
75.000.000 |
0 |
0 |
|
Pekerjaan |
| 77 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
200.000.000 |
0 |
0 |
|
Pekerjaan |
| 78 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
240.000.000 |
0 |
0 |
|
Pekerjaan |
| 79 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
180.000.000 |
0 |
0 |
|
Pekerjaan |
| 80 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
125.000.000 |
0 |
0 |
|
Pekerjaan |
| 81 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
200.000.000 |
0 |
0 |
|
Pekerjaan |
| 82 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
90.000.000 |
0 |
0 |
|
Pekerjaan |
| 83 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
30.000.000 |
0 |
0 |
|
Pekerjaan |
| 84 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
75.000.000 |
0 |
0 |
|
Pekerjaan |
| 85 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
100.000.000 |
0 |
0 |
|
Pekerjaan |
| 86 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
250.000.000 |
0 |
0 |
|
Pekerjaan |
|
[#] Belanja hibah uang | |
150.000.000 |
0 |
0 |
|
|
[-] Hibah Uang | |
150.000.000 |
0 |
0 |
|
|
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar | |
150.000.000 |
0 |
0 |
|
| 1 |
Belanja Hibah Uang kepada Badan dan Lembaga Nirlaba, Sukarela dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar |
| |
150.000.000 |
0 |
0 |
|
Pekerjaan |
| |
Jumlah Pada Sub Kegiatan | |
8.942.000.000 |
0 |
0 |
|
|
3.27.03.2.02.0009 Pembangunan, Rehabilitasi dan Pemeliharaan Prasarana Pertanian Lainnya | |
0 |
0 |
0 |
|
|
[#] Belanja Hibah Barang kepada Badan dan Lembaga yang Bersifat Nirlaba, Sukarela dan Sosial yang Dibentuk Berdasarkan Peraturan Perundang-Undangan | |
0 |
0 |
0 |
|
|
[-] Belanja Hibah Barang kepada Badan dan Lembaga yang Bersifat Nirlaba, Sukarela dan Sosial yang Dibentuk Berdasarkan Peraturan Perundang-Undangan | |
0 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga yang Bersifat Nirlaba, Sukarela dan Sosial yang Dibentuk Berdasarkan Peraturan Perundang-Undangan | |
0 |
0 |
0 |
|
| 1 |
Pembulatan/Penyesuaian |
| |
0 |
0 |
0 |
|
|
|
[#] Belanja hibah barang kepada badan, lembaga yang bersifat nirlaba, sukarela dan sosial yang dibentuk berdasarkan peraturan perundang-undangan | |
0 |
0 |
0 |
|
|
[-] Belanja Hibah Barang kepada Badan dan Lembaga yang Bersifat Nirlaba, Sukarela dan Sosial yang Dibentuk Berdasarkan Peraturan Perundang-Undangan | |
0 |
0 |
0 |
|
|
Belanja Hibah Barang kepada Badan dan Lembaga yang Bersifat Nirlaba, Sukarela dan Sosial yang Dibentuk Berdasarkan Peraturan Perundang-Undangan | |
0 |
0 |
0 |
|
| 1 |
Pembulatan/Penyesuaian |
| |
0 |
0 |
0 |
|
|
| |
Jumlah Pada Sub Kegiatan | |
0 |
0 |
0 |
|
|
3.27.04.2.01.0008 Pemberantasan Penyakit Hewan Menular dan Zoonosis dalam 1 (satu) Daerah Kabupaten/Kota | |
872.824.862 |
0 |
0 |
|
|
[#] belanja obat - obatan - obat | |
4.840.000 |
0 |
0 |
|
|
[-] belanja obat - obatan - obat | |
4.840.000 |
0 |
0 |
|
|
Belanja Obat-Obatan-Obat | |
4.840.000 |
0 |
0 |
|
| 1 |
larvasidal spray |
Gusanex | |
4.840.000 |
0 |
0 |
|
Botol |
|
[#] Belanja Obat - Obatan - Obat -Obatan Lainnya | |
867.984.862 |
0 |
0 |
|
|
[-] Belanja Obat - Obatan Lainnya | |
867.984.862 |
0 |
0 |
|
|
Belanja Obat-Obatan-Obat-Obatan Lainnya | |
867.984.862 |
0 |
0 |
|
| 1 |
Antihistamin ijeksi kemasan 100 ml |
100 ml | |
5.275.000 |
0 |
0 |
|
Botol |
| 2 |
Obat Cacing Untuk Hewan Besar isi 42 bls |
| |
535.917.708 |
0 |
0 |
|
Pot |
| 3 |
Vaksin Rabies |
Satu Vial Berisi 1Ml Vaksin Cair, 1 Spuit Jarum Suntik, Berisi Vaksin Rabies Inaktif | |
5.355.000 |
0 |
0 |
|
Dosis |
| 4 |
SULPIDON INJ 100 ml |
| |
5.916.890 |
0 |
0 |
|
Botol |
| 5 |
Antibiotik Injeksi |
Kemasan 100 ml | |
5.984.160 |
0 |
0 |
|
Botol |
| 6 |
Vitamin Bolus |
| |
288.425.826 |
0 |
0 |
|
Biji |
| 7 |
Vaksin Kucing |
Vaksin Kucing Untuk Infectious Rhinotracheitis, Herpesvirus, Calcivirus Respiratory Infectios. | |
1.683.060 |
0 |
0 |
|
Dosis |
| 8 |
Antibiotik Sulfadiasin-Trimetropin |
Kemasan 100 Ml | |
14.212.450 |
0 |
0 |
|
Botol |
| 9 |
Vitamin Injeksi |
Kemasan 100 Ml | |
5.214.768 |
0 |
0 |
|
Botol |
| |
Jumlah Pada Sub Kegiatan | |
872.824.862 |
0 |
0 |
|
| |
Jumlah Pada SKPD | |
10.207.924.364 |
0 |
0 |
|
| Jumlah Total | |
28.624.815.677 |
0 |
0 |
|