LAPORAN SERAPAN RINCI
Bulan April Tahun 2024
| Urusan | : | 2 URUSAN PEMERINTAHAN WAJIB YANG TIDAK BERKAITAN DENGAN PELAYANAN DASAR |
| Bidang Urusan | : | 2.15 URUSAN PEMERINTAHAN BIDANG PERHUBUNGAN |
| Program | : | 2.15.02 PROGRAM PENYELENGGARAAN LALU LINTAS DAN ANGKUTAN JALAN (LLAJ) |
| Kegiatan | : | 2.15.02.2.02 Penyediaan Perlengkapan Jalan di Jalan Kabupaten/Kota |
| Sub Kegiatan | : | 2.15.02.2.02.0002 Penyediaan Perlengkapan Jalan di Jalan Kabupaten/Kota |
| Pagu Belanja | : | Rp 1.090.412.650 |
| Kode Rekening | Uraian | Anggaran DPA | Volume | Periode Sampai Bulan April | Sisa | |||
|---|---|---|---|---|---|---|---|---|
| Jumlah | Satuan | Nomor Bukti | Uraian | Realisasi | ||||
| 5.1.02.01.01.0001 | Belanja Bahan-Bahan Bangunan dan Konstruksi | 0 | 0 | 0 | ||||
|
Aspal Bitumen
AC (AC 60-70)
|
0 | 0 | 0 | 0 | ||||
| 5.1.02.01.01.0004 | Belanja Bahan-Bahan Bakar dan Pelumas | 1.008.000 | 0 | 1.008.000 | ||||
|
Dexlite
0
|
1.008.000 | 56 | Liter | 0 | 1.008.000 | |||
| 5.1.02.02.01.0004 | Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan | 9.000.000 | 0 | 9.000.000 | ||||
|
Pejabat Pelaksana Teknis Kegiatan (PPTK)
Nilai pagu dana di atas Rp. 100 Juta s.d. Rp.250 Juta
|
4.200.000 | 12 | Orang / Bulan | 0 | 4.200.000 | |||
|
Staf Tehnis / Administrasi PPTK
Nilai pagu dana di atas Rp. 100 Juta s.d. Rp.250 Juta
|
4.800.000 | 24 | Orang / Bulan | 0 | 4.800.000 | |||
| 5.1.02.04.01.0003 | Belanja Perjalanan Dinas Dalam Kota | 2.500.000 | 0 | 2.500.000 | ||||
|
Perjalanan Dinas Dalam Daerah
|
2.500.000 | 1 | Tahun | 0 | 2.500.000 | |||
| 5.2.02.18.01.0001 | Belanja Modal Rambu Bersuar | 64.000.000 | 0 | 64.000.000 | ||||
|
Warning Light
3 Sisi; Tiang Lengkung
|
64.000.000 | 2 | Buah | 0 | 64.000.000 | |||
| 5.2.02.18.01.0003 | Belanja Modal Rambu-Rambu Lalu Lintas Darat Lainnya | 202.000.000 | 0 | 202.000.000 | ||||
|
Rambu Pendahulu Petunjuk Jurusan (RPPJ)
Uk. 120 x 240 Daun Aluminium 3 MM; Tiang : Pipa Bulat
|
190.000.000 | 10 | Buah | 0 | 190.000.000 | |||
|
Sticker Reflektor
Cutting Sticker
|
12.000.000 | 6 | Roll | 0 | 12.000.000 | |||
| 5.2.03.01.01.0032 | Belanja Modal Bangunan Fasilitas Umum | 811.904.650 | 0 | 811.904.650 | ||||
|
Pembulatan
Penyesuaian
|
250 | 250 | Rupiah | 0 | 250 | |||
|
HVS 70 Gr
Folio
|
718.000 | 10 | Rim | 0 | 718.000 | |||
|
Kertas NCR
Uk. A4, 4 Ply, 500 Sheet
|
411.800 | 1 | Box | 0 | 411.800 | |||
|
Binder Clip
No. 200
|
215.250 | 15 | Dus | 0 | 215.250 | |||
|
BallPoint
Biasa
|
60.000 | 15 | Buah | 0 | 60.000 | |||
|
Ordner
Folio
|
75.500 | 2 | Buah | 0 | 75.500 | |||
|
Paper Clips
No.3
|
24.500 | 10 | Dus | 0 | 24.500 | |||
|
BallPoint
Biasa
|
56.000 | 14 | Buah | 0 | 56.000 | |||
|
HVS 70 Gr
Folio
|
430.800 | 6 | Rim | 0 | 430.800 | |||
|
Paper Clips
No.3
|
36.750 | 15 | Dus | 0 | 36.750 | |||
|
Ordner
Folio
|
75.500 | 2 | Buah | 0 | 75.500 | |||
|
Pembulatan
Penyesuaian
|
950 | 950 | Rupiah | 0 | 950 | |||
|
Photo Copy
HVS A4/F4 70 gr
|
997.150 | 2849 | Lembar | 0 | 997.150 | |||
|
Tinta Printer
Ukuran 100 Ml (Hitam)
|
515.700 | 9 | Buah | 0 | 515.700 | |||
|
Tinta Printer
Ukuran 100 Ml (Warna)
|
286.500 | 5 | Buah | 0 | 286.500 | |||
|
Jasa Konsultansi Pengawasan
|
3.000.000 | 1 | Paket | 0 | 3.000.000 | |||
|
Jasa Konsultansi Pengawasan
|
3.000.000 | 1 | Paket | 0 | 3.000.000 | |||
|
Jasa Konsultansi Pengawasan
|
3.000.000 | 1 | Paket | 0 | 3.000.000 | |||
|
Belanja Modal Bangunan Fasilitas Umum
|
15.000.000 | 1 | Paket | 0 | 15.000.000 | |||
|
Jasa Konsultansi Pengawasan
|
3.000.000 | 1 | Paket | 0 | 3.000.000 | |||
|
Jasa Lainnya
|
75.000.000 | 1 | Paket | 0 | 75.000.000 | |||
|
Pekerjaan Konstruksi
-
|
200.000.000 | 1 | Paket | 0 | 200.000.000 | |||
|
Pekerjaan Konstruksi
-
|
55.000.000 | 1 | Paket | 0 | 55.000.000 | |||
|
Pekerjaan Konstruksi
-
|
55.000.000 | 1 | Paket | 0 | 55.000.000 | |||
|
Pekerjaan Konstruksi
-
|
55.000.000 | 1 | Paket | 0 | 55.000.000 | |||
|
Pekerjaan Konstruksi
-
|
55.000.000 | 1 | Paket | 0 | 55.000.000 | |||
|
Jasa Konsultansi Pengawasan
|
7.000.000 | 1 | Paket | 0 | 7.000.000 | |||
|
Jasa Konsultansi Perencanaan
|
10.000.000 | 1 | Paket | 0 | 10.000.000 | |||
|
Perjalanan Dinas Dalam Daerah
|
4.000.000 | 1 | Tahun | 0 | 4.000.000 | |||
|
Belanja Modal Bangunan Fasilitas Umum
|
40.000.000 | 1 | Paket | 0 | 40.000.000 | |||
|
Jasa Lainnya
|
75.000.000 | 1 | Paket | 0 | 75.000.000 | |||
|
Jasa Lainnya
|
0 | 0 | 0 | 0 | ||||
|
Jasa Lainnya
|
75.000.000 | 1 | Paket | 0 | 75.000.000 | |||
|
Jasa Lainnya
|
75.000.000 | 1 | Paket | 0 | 75.000.000 | |||
| Total | 1.090.412.650 | 0 | 1.090.412.650 | |||||