LAPORAN SERAPAN RINCI
Bulan Mei Tahun 2025
| Urusan | : | 1 URUSAN PEMERINTAHAN WAJIB YANG BERKAITAN DENGAN PELAYANAN DASAR |
| Bidang Urusan | : | 1.01 URUSAN PEMERINTAHAN BIDANG PENDIDIKAN |
| Program | : | 1.01.02 PROGRAM PENGELOLAAN PENDIDIKAN |
| Kegiatan | : | 1.01.02.2.02 Pengelolaan Pendidikan Sekolah Menengah Pertama |
| Sub Kegiatan | : | 1.01.02.2.02.0014 Rehabilitasi Sedang/Berat Ruang Kelas Sekolah |
| Pagu Belanja | : | Rp 1.432.399.200 |
| Kode Rekening | Uraian | Anggaran DPA | Volume | Periode Sampai Bulan Mei | Sisa | |||
|---|---|---|---|---|---|---|---|---|
| Jumlah | Satuan | Nomor Bukti | Uraian | Realisasi | ||||
| 5.2.03.01.01.0010 | Belanja Modal Bangunan Gedung Tempat Pendidikan | 1.432.399.200 | 0 | 1.432.399.200 | ||||
|
Bag/Portbale Case With Handle /Tas Dokumen
|
93.600 | 3 | Buah | 0 | 93.600 | |||
|
Stop Map
Kertas
|
53.750 | 25 | Buah | 0 | 53.750 | |||
|
Isi Stapples
1210, Kecil
|
105.400 | 4 | Dus | 0 | 105.400 | |||
|
Paper Clips
No.1
|
25.800 | 4 | Dus | 0 | 25.800 | |||
|
Binder Clip
No. 105
|
32.250 | 5 | Dus | 0 | 32.250 | |||
|
Binder Clip
No. 200
|
96.750 | 3 | Dus | 0 | 96.750 | |||
|
Ballpoint
Ball Point gel
|
103.250 | 1 | Dus | 0 | 103.250 | |||
|
Kertas Ncr Top
Ukuran F4
|
69.850 | 1 | Rim | 0 | 69.850 | |||
|
Kertas Ncr Bottom
Ukuran F4
|
64.500 | 1 | Rim | 0 | 64.500 | |||
|
Post It
|
14.750 | 1 | Pak | 0 | 14.750 | |||
|
Kertas Ncr Middle
Ukuran F4
|
68.250 | 1 | Rim | 0 | 68.250 | |||
|
Tinta Printer
Tinta Printer 003
|
280.000 | 2 | Botol | 0 | 280.000 | |||
|
Photo Copy
HVS A4/F4 70 gr
|
631.400 | 1804 | Lembar | 0 | 631.400 | |||
|
Photo Copy
A3
|
45.000 | 30 | Lembar | 0 | 45.000 | |||
|
Penjilidan Buku/Dokumen
Jilid lakban 101 - 200 lembar
|
135.000 | 9 | Buku | 0 | 135.000 | |||
|
Jasa Konsultansi Pengawasan
-
|
33.000.000 | 1 | Paket | 0 | 33.000.000 | |||
|
Jasa Konsultansi Perencanaan
-
|
47.000.000 | 1 | Paket | 0 | 47.000.000 | |||
|
Nasi Kotak
Biasa
|
1.125.000 | 45 | Box | 0 | 1.125.000 | |||
|
Snack Kotak
Biasa
|
524.250 | 45 | Box | 0 | 524.250 | |||
|
Materai
Materai 10.000
|
355.500 | 30 | Buah | 0 | 355.500 | |||
|
Narasumber/ Pembahas/ Tenaga Ahli
Pejabat Eselon II / yang disetarakan
|
4.000.000 | 4 | Orang / Jam | 0 | 4.000.000 | |||
|
Narasumber/ Pembahas/ Tenaga Ahli
Pejabat Eselon III ke bawah / yang disetarakan
|
7.200.000 | 8 | Orang / Jam | 0 | 7.200.000 | |||
|
Pejabat Pengadaan Jasa Konsultansi - Ketua
Nilai pagu dana s.d. Rp. 50 Juta
|
0 | 0 | 0 | 0 | ||||
|
Tim Pendukung PPK 500 jt - 1 M
Ketua
|
350.000 | 1 | Orang / Paket | 0 | 350.000 | |||
|
Tim Pendukung PPK 500 jt - 1 M
Sekretaris
|
325.000 | 1 | Orang / Paket | 0 | 325.000 | |||
|
Tim Pendukung PPK 500 jt - 1 M
Anggota
|
300.000 | 1 | Orang / Paket | 0 | 300.000 | |||
|
Pekerjaan Konstruksi
|
900.000.000 | 1 | Paket | 0 | 900.000.000 | |||
|
Bag/Portbale Case With Handle /Tas Dokumen
|
312.000 | 10 | Buah | 0 | 312.000 | |||
|
Binder Clip
No. 105
|
19.350 | 3 | Dus | 0 | 19.350 | |||
|
Binder Clip
No. 107
|
23.250 | 3 | Dus | 0 | 23.250 | |||
|
Binder Clip
No. 111
|
38.700 | 3 | Dus | 0 | 38.700 | |||
|
Binder Clip
No. 200
|
96.750 | 3 | Dus | 0 | 96.750 | |||
|
Binder Clip
No. 260
|
122.550 | 3 | Dus | 0 | 122.550 | |||
|
Isi Stapples
1210, Kecil
|
131.750 | 5 | Dus | 0 | 131.750 | |||
|
Ordner
Folio
|
188.750 | 5 | Buah | 0 | 188.750 | |||
|
Paper Clips
No.1
|
32.250 | 5 | Dus | 0 | 32.250 | |||
|
Post It
|
73.750 | 5 | Pak | 0 | 73.750 | |||
|
Stop Map
Kertas
|
430.000 | 200 | Buah | 0 | 430.000 | |||
|
Pembulatan/Penyesuaian
|
50 | 50 | Rupiah | 0 | 50 | |||
|
Tinta Printer
Tinta Printer 003
|
420.000 | 3 | Botol | 0 | 420.000 | |||
|
Tinta Refill
Serbuk
|
372.900 | 2 | Buah | 0 | 372.900 | |||
|
Photo Copy
HVS A4/F4 70 gr
|
1.610.350 | 4601 | Lembar | 0 | 1.610.350 | |||
|
Photo Copy
A3
|
225.000 | 150 | Lembar | 0 | 225.000 | |||
|
Penjilidan Buku/Dokumen
Jilid lakban 201 - 300 lembar
|
860.000 | 43 | Buku | 0 | 860.000 | |||
|
Materai
Materai 10.000
|
592.500 | 50 | Buah | 0 | 592.500 | |||
|
Pejabat Pengadaan Jasa Konsultansi - Ketua
Nilai pagu dana s.d. Rp. 50 Juta
|
0 | 0 | 0 | 0 | ||||
|
Pejabat Pengadaan Pekerjaan Konstruksi/ Barang/ Jasa Lainnya - Ketua
Nilai pagu dana di atas Rp. 100 Juta s.d. Rp. 200 Juta
|
0 | 0 | 0 | 0 | ||||
|
Tim Pendukung PPK 100 jt - 200 jt
Ketua
|
500.000 | 2 | Orang / Paket | 0 | 500.000 | |||
|
Tim Pendukung PPK 100 jt - 200 jt
Sekretaris
|
450.000 | 2 | Orang / Paket | 0 | 450.000 | |||
|
Tim Pendukung PPK 100 jt - 200 jt
Anggota
|
400.000 | 2 | Orang / Paket | 0 | 400.000 | |||
|
Jasa Konsultansi Pengawasan
-
|
11.000.000 | 1 | Paket | 0 | 11.000.000 | |||
|
Jasa Konsultansi Pengawasan
-
|
11.000.000 | 1 | Paket | 0 | 11.000.000 | |||
|
Jasa Konsultansi Perencanaan
-
|
17.000.000 | 1 | Paket | 0 | 17.000.000 | |||
|
Jasa Konsultansi Perencanaan
-
|
17.000.000 | 1 | Paket | 0 | 17.000.000 | |||
|
Perjalanan Dinas Dalam Daerah
|
1.500.000 | 1 | Tahun | 0 | 1.500.000 | |||
|
Pekerjaan Konstruksi
|
184.000.000 | 1 | Paket | 0 | 184.000.000 | |||
|
Pekerjaan Konstruksi
|
188.000.000 | 1 | Paket | 0 | 188.000.000 | |||
| Total | 1.432.399.200 | 0 | 1.432.399.200 | |||||